ENTSO-E represents 42 Transmission System Operators (TSOs) for electricity across 35 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM).
ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,...More
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights.
The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with...More
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights.
The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with...More
This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation. This proposal covers the design of Long Term Transmission Rights for the South West Europe Region.
More
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Italy North Capacity Calculation Region
More
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Greece-Italy Capacity Calculation Region
More
EirGrid Interconnector DAC, Moyle Interconnector Ltd., EirGrid Plc., and SONI Ltd. seek to consult on the Ireland-United Kingdom (IU) regional proposal for the regional design of long-term transmission rights in accordance with Commission Regulation (EU) 2016/1719 establishing a Guideline on Forward Capacity Allocation (the "FCA Regulation").
More
The consultation concerns the design of long-term regional design of long-term transmission rights for the Channel CCR with Article 31 of Commission Regulation (EU) 2016/1719 establishing a guideline on forward capacity calculation. This proposal covers the Channel CCRs for the regional design of long-term transmission rights for relevant TSOs within the said region.
More
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the SEE Capacity Calculation Region.
More
ENTSO-E R&I Implementation Plan 2017-2019 is the planning instrument for coordinating efforts in research, development, and innovation with the overarching goal of establishing and maintaining an efficient, cost-effective, reliable and secure European power system.
Looking at the current state of the art and how technology and business are evolving, the R&I Implementation Plan streamlines the topics earmarked for starting in year 2017 and outlines R&D topics to be tackled in years 2018 and...More
The consultation concerns the regional TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Reulation). This proposal covers fallback procedures for the SEE Capacity Calculation Region.
More
The present public consultation aims at obtaining stakeholders' comments on the Generation and Load Data Provision Methodology pursuant to Article 17 of Regulation 2016/1719 or "GLDPM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline).
More
The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Article 18 of Regulation 2016/1719 or "CGMM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline).
More
This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation (FCA Regulation). This proposal covers the design of Long Term Transmission Rights for the Core Region.
More
The consultation concerns the Nordic CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Capacity Calculation Region Nordic.
Due to time contraints the consultation concerns the explanatory document and not a draft legal proposal. Stakeholder feedback on the...More
The consultation concerns the Core CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Core region.
More
The consultation concerns the Baltic Capacity Calculation Region (CCR) TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Baltic CCR region.
More
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016.
The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Nordic CCR.
More
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance with the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management ("CACM Regulation").
The proposed amendment requests focuses on...More
This consultation concerns the proposal for the single methodology for cross zonal intraday capacity pricing in accordance with Article 55 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). The single methodology for pricing cross zonal intraday capacity is based on implicit auctions complementing continuous trading mechanism on European level.
More
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Greece-Italy Capacity Calculation Region
More
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Hansa Capacity Calculation Region.
More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the SWE CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the SWE CCR.
More
This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2015/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the borders for Capacity Calculation Region Hansa.
More
This consultation concerns the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management.
This proposal cover the capacity calculation methodology for Capacity Calculation Region Hansa
More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Channel Capacity Calculation Regions (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Channel CCR.
More
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on a bidding zone boder shall submit a proposal for the respective nomination rules.
The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability...More
This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the Regional design of long-term transmission rights for Capacity Calculation Region Nordic
More
Project TERRE is one of the number of initiatives set up by ENTSO-E, with the aim of gaining experience from cross-border exchanges of balancing energy between TSOs in compliance with the future Electricity Balancing Guideline. TERRE is currently the leading project to exchange Replacement Reserves (RR), and entered the implementation phase beginning 2017.
More