Find Consultations

  • Capacity Calculation Methodology Proposal for SWE CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the SWE CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the... More
    Closed 1 day ago
  • Capacity Calculation Methodology for the Nordic CCR – Legal proposal

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. After having had a... More
    Opened 3 weeks ago
  • Capacity Calculation Region Nordic’s proposal for regional design of long-term transmission rights

    This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the Regional... More
    Opened 3 weeks ago
  • Public consultation for the design of TERRE (Trans European Replacement Reserves Exchange) and RR Harmonised Balancing Area

    Project TERRE is one of the number of initiatives set up by ENTSO-E, with the aim of gaining experience from cross-border exchanges of balancing energy between TSOs in compliance with the future Electricity Balancing Guideline. TERRE is currently the leading project to exchange Replacement... More
    Opened 3 weeks ago
  • Core TSOs' proposal on the Intraday Flow-based Capacity Calculation Methodology

    This consultation concerns the Core CCR TSOs’ proposal for the regional design of the day-ahead common capacity calculation methodology in accordance with Article 20 ff. of Commission Regulation (EU) 2015/1222 of 24 July 2015. This proposal covers the intraday capacity calculation methodology... More
    Opened 3 weeks ago
  • Core TSOs' proposal on the Day-Ahead Flow-based Capacity Calculation Methodology

    This consultation concerns the Core CCR TSOs’ proposal for the regional design of the day-ahead common capacity calculation methodology in accordance with Article 20 ff. of Commission Regulation (EU) 2015/1222 of 24 July 2015. This proposal covers the day-ahead capacity calculation... More
    Opened 3 weeks ago
  • Nomination Rules for Physical Transmission Rights

    Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on a bidding zone boder shall submit a proposal for the respective... More
    Opened 3 weeks ago
  • Capacity Calculation Methodology Proposal for the Channel CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Channel Capacity Calculation Regions (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion... More
    Opened 1 month ago
  • Capacity Calculation Methodology for Capacity Calculation Region Hansa

    This consultation concerns the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This... More
    Opened 1 month ago
  • Capacity Calculation Region Hansa’s proposal for regional design of long-term transmission rights

    This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2015/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the borders... More
    Opened 1 month ago
  • Capacity Calculation Methodology Proposal for the Nordic CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers... More
    Closed 2 months ago
  • Fallback procedures for Capacity Calculation Region Hansa

    This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback... More
    Closed 2 months ago
  • All TSOs’ proposal for the single methodology for pricing cross-zonal intraday capacity

    This consultation concerns the proposal for the single methodology for cross zonal intraday capacity pricing in accordance with Article 55 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). The single... More
    Closed 2 months ago
  • Fallback procedure for Greece-Italy Capacity Calculation Region

    This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback... More
    Closed 2 months ago
  • All TSOs' proposal for amendment to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

    This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance with... More
    Closed 2 months ago
  • Baltic CCR TSOs' proposal for fallback procedures

    The consultation concerns the Baltic Capacity Calculation Region (CCR) TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation).... More
    Closed 3 months ago
  • ENTSO-E Connection Codes Implementation Guidance Documents

    Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to... More
    Closed 3 months ago
  • Core TSOs’ proposal for Fallback Procedures

    The consultation concerns the Core CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback... More
    Closed 3 months ago
  • Nordic CCR TSOs' proposal for fallback procedures

    The consultation concerns the Nordic CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback... More
    Closed 3 months ago
  • Regional Design of Long Term Transmission Rights within Core CCR

    This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation (FCA Regulation). This proposal covers the design of Long Term... More
    Closed 3 months ago
  • GLDPM-v2 (revised Generation and Load Data Provision Methodology)

    The present public consultation aims at obtaining stakeholders' comments on the Generation and Load Data Provision Methodology pursuant to Article 17 of Regulation 2016/1719 or "GLDPM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). More
    Closed 4 months ago
  • CGMM-v2 (revised Common Grid Model Methodology)

    The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Article 18 of Regulation 2016/1719 or "CGMM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). More
    Closed 4 months ago
  • SEE CCR: Fallback procedures

    The consultation concerns the regional TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Reulation). This proposal covers fallback... More
    Closed 4 months ago
  • Regional Design of Long Term Transmission Rights within SEE CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term... More
    Closed 4 months ago
  • ENTSO-E Research and Innovation Implementation Plan 2017-2019

    ENTSO-E R&I Implementation Plan 2017-2019 is the planning instrument for coordinating efforts in research, development, and innovation with the overarching goal of establishing and maintaining an efficient, cost-effective, reliable and secure European power system. Looking at the current state... More
    Closed 4 months ago
  • Regional Design of Long Term Transmission Rights within Greece-Italy CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term... More
    Closed 4 months ago
  • Regional Design of Long Term Transmission Rights within Italy North CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term... More
    Closed 4 months ago
  • IU (Ireland-UK) regional design of Long Term Transmission Rights

    EirGrid Interconnector DAC, Moyle Interconnector Ltd., EirGrid Plc., and SONI Ltd. seek to consult on the Ireland-United Kingdom (IU) regional proposal for the regional design of long-term transmission rights in accordance with Commission Regulation (EU) 2016/1719 establishing a Guideline on... More
    Closed 5 months ago
  • Channel Region; FCA Regional Design of Long-Term Transmission Rights – Public Consultation

    The consultation concerns the design of long-term regional design of long-term transmission rights for the Channel CCR with Article 31 of Commission Regulation (EU) 2016/1719 establishing a guideline on forward capacity calculation. This proposal covers the Channel CCRs for the regional design of... More
    Closed 5 months ago
  • Harmonised Allocation Rules for long-term Transmission Rights - Annex 14

    Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights. The FCA Regulation... More
    Closed 5 months ago
64 results. Page 1 of 3