This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation...More
Energinet and TenneT GmbH have a long history of close cooperation on operational matters with the two companies being in the same LFC Block. Energinet has always operated Denmark West as an LFC Area with its own LFC. Any remaining imbalances have then been balanced by the TenneT LFC. The...More
Core CCR runs this survey about the static grid model. The aim is to gather the market parties’ feedback to have more clarity on the needs and aimed usage, allowing Core TSOs to make an adequate proposal.
More
This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodology (LTCCM) in accordance with Article 10(1) of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA). This proposal is...More
Background & purpose
Long-Term Transmission Rights (LTTRs) are commonly used by market participants to hedge their cross-border electricity transactions. During the Market European Stakeholder Committee meeting of 17 June 2020, some market participants requested that alongside the...More
Background
According to Article 58 of Network Code Requirements for Generators (NC RfG), Article 56 of Network Code Demand Connection (NC DC) and Article 75 of Network Code High Voltage Direct Current (NC HVDC), ENTSO-E has the obligation to prepare...More
ENTSO-E represents 42 Transmission System Operators (TSOs) for electricity across 35 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of...More
This consultation concerns the proposal of all Nordic TSOs for the minimum activation period to be ensured by FCR providers in accordance with Article 156(10) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation...More
This consultation concerns the regional TSOs’ proposal for common coordinated redispatching and countertrading methodology in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM)....More
This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodologies in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). This...More
ENTSO-E’s 10-year network development plan (TYNDP) is the pan-European electricity infrastructure development plan. It looks at the future power system in its entirety and at how power links and storage can be used to make the energy transition happen in a cost-effective and secure way.
...More
This consultation concerns exact balancing capacity gate closure time in accordance with Article 3 of ACER decision No 19/2020 of 5 August 2020 on the common and harmonised rules and processes for procurement and exchange of aFRR balancing capacity for the Nordic LFC Block. The proposal has...More
Regulation (EU) 347/2013 requires that ENTSO-E
and ENTSOG use scenarios for their respective Ten-
Year Network Development Plans (TYNDPs) 2022. The
development of the scenarios marks the first step in the
TYNDP 2022 process. Defining the scenarios in turn begins
with the development of...More
The TSOs performing the reserve replacement process ('RR TSOs') are launching a public consultation from 21 September to 21 October 2020 on their proposal for an amendment of the implementation framework for a European platform for the exchange of balancing energy from replacement...More
This consultation is based on Article 10(1) of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the proposal for a common long-term capacity calculation methodology for the Core region.
More
This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the determination of capacity calculation regions as defined in accordance with Article 15(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management.
On 5 June 2020, ACER’s...More
This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the regional TSO proposal for new proposal of Shadow Allocation Rules which are part of approved fallback procedures elaborated in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and...More
This consultation concerns the all-TSO Proposal for the amendment, dated from 30/06/2020, of the EU Shadow Allocation Rules (EU SAR).
In cooperation with all other TSOs across Europe, Hansa TSOs and Statnett plan to amend the Shadow Allocation Rules for the Hansa CCR and NO-borders...More
This consultation concerns the Core CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM).
In cooperation with all other TSOs across Europe, Core TSOs plan to amend the Regional Shadow Allocation Rules for the Core CCR in...More
This consultation concerns the Italy North CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM).
In cooperation with all other TSOs across Europe, Italy North TSOs plan to amend the Regional Shadow Allocation Rules for the...More
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback...More
This consultation concerns the SWE CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM).
In cooperation with all other TSOs across Europe, SWE TSOs plan to amend the Regional Shadow Allocation Rules for the SWE CCR...More
This consultation concerns the Channel CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM).
In cooperation with all other TSOs across Europe, Channel TSOs plan to amend the Shadow Allocation Rules 1.4 for the...More
This public consultation aims to collect stakeholders feedback on ENTSO-E draft Research & Development & Innovation Roadmap for 2020-2030 . This deliverable is a requested by article 30 of Regulation 2019/943.
The publication can be found via this link and below, under related links.
More
ENTSO-E's draft Annual Work Programme details our planned activities from January to December 2021 as per Art. 30.1(i) and 30.4 of Regulation 2019/943. The Annual Work Programme focuses on ENTSO-E's legal mandates in the areas of System Operations, Markets, System Development, Transparency...More
This consultation concerns the Core CCR TSOs’ proposal for the first amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015 establishing a guideline on...More
ENTSO-E's Annual Report 2019 describes our activities from January 2019 to December 2019. It focuses on the legal mandates given to ENTSO-E .
2019 was marked by the entry into force of the Clean Energy Package (CEP). While ENTSO-E and TSOs are still implementing the Third Package ...More
This consultation concerns the regional TSOs’ proposal of common capacity calculation methodology for the day-ahead and intraday market timeframe in accordance with Article 21 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and...More