This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
In accordance with the ACER decision 29/2020 of 24 November 2020 on the methodology and assumptions that are to be used in the Bidding Zone Review process and for the alternative bidding zone configurations to be considered (BZR Methodology), Transmission System Operators ("TSOs") of all...More
With the integration of Europe’s electricity markets, large-scale renewable capacity integration and shifting demand patterns on the path to European climate neutrality goals, resource adequacy will be in the spotlight for coming decades. ENTSO-E and its TSO members are continuously...More
This consultation concerns the amended methodology of all Nordic TSOs for sharing and exchange limits of FRR/RR between synchronous areas in accordance with Article 176(1), 177(1), 178(1) and 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on...More
This consultation concerns the amended methodology of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system...More
This consultation concerns the amendment of the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion...More
Background
According to Article 58 of Network Code Requirements for Generators (NC RfG), Article 56 of Network Code Demand Connection (NC DC) and Article 75 of Network Code High Voltage Direct Current (NC HVDC), ENTSO-E has the obligation to prepare...More
For consultation until 15 February 2023: revised CBA methodology for assessing electricity grid infrastructure projects
The 4 th CBA Guideline aims at providing guidance on how to perform an energy system-wide cost-benefit analysis. The Guideline describes ENTSO-E’s criteria for...More
The TYNDP 2022 package was submitted to public consultation from end-July to mid-September 2022. Cost-benefit analysis (CBA) results for several scenarios have become available between August and December 2022. This short public consultation aims at giving stakeholders the possibility to comment...More
This consultation concerns the SEE CCR TSOs’ proposal for an amendment of the common capacity calculation methodology for the day-ahead and intraday market time-frame in accordance with Article 21 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on...More
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules.
The current amendment proposal contains general...More
This consultation concerns the SEE CCR TSOs’ proposal for an amendment of the Coordinated redispatching and countertrading methodology in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion...More
Will demand for power in Europe be covered in the next decade by adequate supply? What could be the impact of climate on the European power system? Why is interdependency between European countries essential in assessing security of supply? Why is coordination at all levels necessary?
These...More
This consultation concerns the Core CCR TSOs’ proposal for the third amendment of the Intraday Capacity Calculation Methodology of the Core Capacity Calculation Region (‘Core ID CCM’) in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015...More
This consultation concerns the Core CCR TSOs’ proposal for the second amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region (‘Core DA CCM’) in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015...More
ENTSO-E Secretariat together with the Market Information and Transparency Working Group (MIT WG) is conducting this survey regarding the ENTSO-E Transparency Platform (TP) user experience. The survey is structured into 6 main subjects:
User Introduction
Data...More
For each task set out in Article 37(1) of the Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (“Regulation (EU) 2019/943”) and not already covered by the relevant network codes or guidelines, the European Network of...More
For each task set out in Article 37(1) of the Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (“Regulation (EU) 2019/943”) and not already covered by the relevant network codes or guidelines, the European Network...More
This consultation concerns the methodology for the common capacity calculation performed for the capacity allocation within the balancing timeframe for South East European Calculation Region as required by Article 37 of Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline...More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
This consultation concerns the regional TSO proposal for a common methodology within the South West Europe Capacity Calculation Region on the common capacity calculation performed for the capacity allocation within the balancing timeframe. This methodology is developed in accordance with...More
In accordance with the ACER decision 29/2020 of 24 November 2020 on the methodology and as-sumptions that are to be used in the Bidding Zone Review process and for the alternative bidding zone configurations to be considered (BZR Methodology), Transmission System Operators ("TSOs") of all Bidding...More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
This consultation concerns the regional TSO proposal for a market-based methodology of cross-zonal capacity allocation for the exchange of balancing capacity or sharing of reserves, in accordance with Article 41 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a...More
The methodology for Day-Ahead Scheduled Exchanges Calculation (DA SEC) is developed pursuant to art. 43 of Commision Regulation (EU) 2015/1222 of 24 July 2015 .
Due to 15 min MTU the scheduled exchange calculation methodology needs amending. DA SEC deals with three forms of market flows....More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity...More
ENTSO-E’s 10-year network development plan (TYNDP) is the pan-European electricity infrastructure development plan. It looks at the future power system in its entirety and at how power links and storage can be used to make the energy transition happen in a cost-effective and secure way.
...More
ENTSO-E, the European Network of Transmission System Operators for Electricity, is the association for the cooperation of the European transmission system operators (TSOs). The 39 member TSOs representing 35 countries are responsible for the secure and coordinated operation of Europe’s...More