394 results
-
Stakeholder Satisfaction Survey 2016
ENTSO-E represents 42 Transmission System Operators (TSOs) for electricity across 35 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,... MoreOpened 11 January 2017 -
Harmonised Allocation Rules for long-term Transmission Rights
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with... MoreOpened 16 January 2017 -
Harmonised Allocation Rules for long-term Transmission Rights - Annex 14
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with... MoreOpened 27 January 2017 -
Design of Long Term Transmission Rights on SWE (South West Europe)
This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation. This proposal covers the design of Long Term Transmission Rights for the South West Europe Region. MoreOpened 30 January 2017 -
Regional Design of Long Term Transmission Rights within Italy North CCR
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Italy North Capacity Calculation Region MoreOpened 7 February 2017 -
Regional Design of Long Term Transmission Rights within Greece-Italy CCR
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Greece-Italy Capacity Calculation Region MoreOpened 8 February 2017 -
IU (Ireland-UK) regional design of Long Term Transmission Rights
EirGrid Interconnector DAC, Moyle Interconnector Ltd., EirGrid Plc., and SONI Ltd. seek to consult on the Ireland-United Kingdom (IU) regional proposal for the regional design of long-term transmission rights in accordance with Commission Regulation (EU) 2016/1719 establishing a Guideline on Forward Capacity Allocation (the "FCA Regulation"). MoreOpened 8 February 2017 -
Channel Region; FCA Regional Design of Long-Term Transmission Rights – Public Consultation
The consultation concerns the design of long-term regional design of long-term transmission rights for the Channel CCR with Article 31 of Commission Regulation (EU) 2016/1719 establishing a guideline on forward capacity calculation. This proposal covers the Channel CCRs for the regional design of long-term transmission rights for relevant TSOs within the said region. MoreOpened 8 February 2017 -
Regional Design of Long Term Transmission Rights within SEE CCR
The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the SEE Capacity Calculation Region. MoreOpened 20 February 2017 -
ENTSO-E Research and Innovation Implementation Plan 2017-2019
ENTSO-E R&I Implementation Plan 2017-2019 is the planning instrument for coordinating efforts in research, development, and innovation with the overarching goal of establishing and maintaining an efficient, cost-effective, reliable and secure European power system. Looking at the current state of the art and how technology and business are evolving, the R&I Implementation Plan streamlines the topics earmarked for starting in year 2017 and outlines R&D topics to be tackled in years 2018 and... MoreOpened 24 February 2017 -
SEE CCR: Fallback procedures
The consultation concerns the regional TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Reulation). This proposal covers fallback procedures for the SEE Capacity Calculation Region. MoreOpened 1 March 2017 -
GLDPM-v2 (revised Generation and Load Data Provision Methodology)
The present public consultation aims at obtaining stakeholders' comments on the Generation and Load Data Provision Methodology pursuant to Article 17 of Regulation 2016/1719 or "GLDPM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). MoreOpened 6 March 2017 -
CGMM-v2 (revised Common Grid Model Methodology)
The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Article 18 of Regulation 2016/1719 or "CGMM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). MoreOpened 6 March 2017 -
Regional Design of Long Term Transmission Rights within Core CCR
This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation (FCA Regulation). This proposal covers the design of Long Term Transmission Rights for the Core Region. MoreOpened 10 March 2017 -
Nordic CCR TSOs' proposal for fallback procedures
The consultation concerns the Nordic CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Capacity Calculation Region Nordic. Due to time contraints the consultation concerns the explanatory document and not a draft legal proposal. Stakeholder feedback on the... MoreOpened 13 March 2017 -
Core TSOs’ proposal for Fallback Procedures
The consultation concerns the Core CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Core region. MoreOpened 27 March 2017 -
Baltic CCR TSOs' proposal for fallback procedures
The consultation concerns the Baltic Capacity Calculation Region (CCR) TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Baltic CCR region. MoreOpened 5 April 2017 -
ENTSO-E Connection Codes Implementation Guidance Documents
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called... MoreOpened 5 April 2017 -
Capacity Calculation Methodology Proposal for the Nordic CCR
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Nordic CCR. MoreOpened 7 April 2017 -
All TSOs' proposal for amendment to include the upcoming BE-GB interconnector in the decision on capacity calculation regions
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance with the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management ("CACM Regulation"). The proposed amendment requests focuses on... MoreOpened 7 April 2017 -
All TSOs’ proposal for the single methodology for pricing cross-zonal intraday capacity
This consultation concerns the proposal for the single methodology for cross zonal intraday capacity pricing in accordance with Article 55 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). The single methodology for pricing cross zonal intraday capacity is based on implicit auctions complementing continuous trading mechanism on European level. MoreOpened 11 April 2017 -
Fallback procedure for Greece-Italy Capacity Calculation Region
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Greece-Italy Capacity Calculation Region MoreOpened 12 April 2017 -
Fallback procedures for Capacity Calculation Region Hansa
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Hansa Capacity Calculation Region. MoreOpened 14 April 2017 -
Capacity Calculation Methodology Proposal for SWE CCR
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the SWE CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the SWE CCR. MoreOpened 14 June 2017 -
Capacity Calculation Region Hansa’s proposal for regional design of long-term transmission rights
This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2015/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the borders for Capacity Calculation Region Hansa. MoreOpened 14 June 2017 -
Capacity Calculation Methodology for Capacity Calculation Region Hansa
This consultation concerns the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal cover the capacity calculation methodology for Capacity Calculation Region Hansa MoreOpened 15 June 2017 -
Capacity Calculation Methodology Proposal for the Channel CCR
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Channel Capacity Calculation Regions (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Channel CCR. MoreOpened 23 June 2017 -
Nomination Rules for Physical Transmission Rights
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on a bidding zone boder shall submit a proposal for the respective nomination rules. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability... MoreOpened 27 June 2017 -
Capacity Calculation Region Nordic’s proposal for regional design of long-term transmission rights
This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the Regional design of long-term transmission rights for Capacity Calculation Region Nordic MoreOpened 30 June 2017 -
Public consultation for the design of TERRE (Trans European Replacement Reserves Exchange) and RR Harmonised Balancing Area
Project TERRE is one of the number of initiatives set up by ENTSO-E, with the aim of gaining experience from cross-border exchanges of balancing energy between TSOs in compliance with the future Electricity Balancing Guideline. TERRE is currently the leading project to exchange Replacement Reserves (RR), and entered the implementation phase beginning 2017. MoreOpened 30 June 2017
394 results.
Page 2 of 14