This consultation concerns adjusting the maximum price for all balancing energy product bids and the maximum value of the cross-border marginal price ( CBMP) as well as the minimum price for all balancing energy product bids and the minimum value of the CBMP defined in Article 3(3) of the...More
In September 2021, ENTSO-E will begin collecting applications from transmission and storage projects for the TYNDP 2022. Project promoters and interested stakeholders are invited to read and comment on the draft Guidance and raise any concerns or questions.
The draft Guidance now submitted...More
This consultation concerns the amended proposal of TSOs of Italy North Region for a common methodology for regional operational security coordination in accordance with Article 76 of Commission Regulation (EU) 2017/1485 of 2 August 2017 (SOGL Regulation).
More
The main reason of the current amendment proposal of the SWE Capacity Calculation Methodology (SWE CCM) is to introduce it in the principles and goals set in Regulation (EC) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast)...More
This consultation concerns amendment proposal to the establishment of common and harmonised rules and processes for the exchange and procurement of Balancing Capacity for Frequency Containment Reserves (FCR) in accordance with Article 33 of Commission Regulation (EU) establishing a guideline on...More
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on their bidding zone border(s) submitted a proposal for the respective...More
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules.
Together with the HAR main body, all...More
[Deadline extended to 19 May]
Following on the work on the Vision 2030 , ENTSO-E has published its discussion paper “ Options for the design of European Electricity Markets in 2030 ”. The paper presents the interim results of an analysis started in 2018 focusing on necessary...More
Under the Trade and Cooperation Agreement (TCA) between the EU and the UK, the relevant EU and UK TSOs are jointly tasked with developing the Multi-Regional Loose Volume Coupling (MRLVC) solution to allocate capacity on the interconnectors to GB in the day-ahead market timeframe. The first...More
This consultation concerns amendment proposal to the determination of the forecasted market value of cross-zonal capacity for the exchange of energy in single day-ahead coupling – especially mark-up methodology – for the Nordic CCR in accordance with Article 6(4) of ACER decision No 22/2020...More
Background & purpose
Long-Term Transmission Rights (LTTRs) are commonly used by market participants to hedge their cross-border electricity transactions. During the Market European Stakeholder Committee meeting of 17 June 2020, some market participants requested that alongside the...More
Energinet and TenneT GmbH have a long history of close cooperation on operational matters with the two companies being in the same LFC Block. Energinet has always operated Denmark West as an LFC Area with its own LFC. Any remaining imbalances have then been balanced by the TenneT LFC. The...More
In the framework of the training session on SDAC (Single Day Ahead Coupling) decoupling organised by SDAC on 3 March 2021, the Transmission System Operators would like to give market participants the opportunity to express their views about the fallback process currently in place.
...More
This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation...More
This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodology (LTCCM) in accordance with Article 10(1) of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA). This proposal is...More
Core CCR runs this survey about the static grid model. The aim is to gather the market parties’ feedback to have more clarity on the needs and aimed usage, allowing Core TSOs to make an adequate proposal.
More
Background
According to Article 58 of Network Code Requirements for Generators (NC RfG), Article 56 of Network Code Demand Connection (NC DC) and Article 75 of Network Code High Voltage Direct Current (NC HVDC), ENTSO-E has the obligation to prepare...More
This consultation concerns the proposal of all Nordic TSOs for the minimum activation period to be ensured by FCR providers in accordance with Article 156(10) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation...More
This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodologies in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). This...More
This consultation concerns the regional TSOs’ proposal for common coordinated redispatching and countertrading methodology in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM)....More
ENTSO-E’s 10-year network development plan (TYNDP) is the pan-European electricity infrastructure development plan. It looks at the future power system in its entirety and at how power links and storage can be used to make the energy transition happen in a cost-effective and secure way.
...More
This consultation concerns exact balancing capacity gate closure time in accordance with Article 3 of ACER decision No 19/2020 of 5 August 2020 on the common and harmonised rules and processes for procurement and exchange of aFRR balancing capacity for the Nordic LFC Block. The proposal has...More
Regulation (EU) 347/2013 requires that ENTSO-E
and ENTSOG use scenarios for their respective Ten-
Year Network Development Plans (TYNDPs) 2022. The
development of the scenarios marks the first step in the
TYNDP 2022 process. Defining the scenarios in turn begins
with the development of...More
The TSOs performing the reserve replacement process ('RR TSOs') are launching a public consultation from 21 September to 21 October 2020 on their proposal for an amendment of the implementation framework for a European platform for the exchange of balancing energy from replacement...More
This consultation is based on Article 10(1) of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the proposal for a common long-term capacity calculation methodology for the Core region.
More
This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the determination of capacity calculation regions as defined in accordance with Article 15(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management.
On 5 June 2020, ACER’s...More
This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the regional TSO proposal for new proposal of Shadow Allocation Rules which are part of approved fallback procedures elaborated in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and...More
This consultation concerns the Channel CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM).
In cooperation with all other TSOs across Europe, Channel TSOs plan to amend the Shadow Allocation Rules 1.4 for the...More