ENTSO-E welcomes stakeholders’ comments on a draft report describing the General Methodology for the Cost Benefit Analysis and on a draft scoping paper for a specific methodology for the Imbalance Settlement Period Harmonisation. The public consultation runs from 23 February until 31 March.
...More
ENTSO-E has issued a draft of the Harmonised Allocation Rules (HAR) for public consultation. The HAR will apply for forward capacity allocation, subject to relevant approval from national regulators, and for allocated long term transmission rights which delivery date is 1 st of January 2016 or...More
The Third Energy Package tasked ENTSO-E with providing “Recommendations relating to the coordination of technical cooperation between Community and third-country transmission system operators”. These recommendations mainly focus on transmission system operators (TSOs) which are not members of...More
Between 21 May to 22 June (inclusive) ENTSO-E runs the public consultation on the TYNDP 2016 scenarios development report . This public consultation is the third step of formal interraction with the stakeholders in order to build the TYNDP 2016 scenarios.
This report incorporates 5...More
As part of the TYNDP 2016 package ENTSO-E prepared six Regional Investment Plans covering all Europe. These reports are looking at power system development issues from a regional perspective accounting for their particularities and closely coordinated at European level.
The following six...More
The transmission and storage project promoters (ENTSO-E and non-ENTSO-E members) have submitted during April 2015 a number of candidate projects for inclusion in the TYNDP 2016. The submission process followed the EC guidelines for inclusion of projects in the TYNDP.
Before starting the Cost...More
This consultation concerns a common proposal developed by all Transmission System Operators regarding the determination of capacity calculation regions in accordance with Article 15 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and...More
ENTSO-E’s draft 7th Annual Work Programme for the period September 2015 to December 2016, is focusing in particular on our vision in response to the EC’s “Energy Union” initiative. At times of monumental changes in the European energy system, the Association recognises the need to deliver...More
For all three Connection Network Codes ( RfG, DCC and HVDC) ENTSO-E shall deliver no later than 6 month after the entry into force non-bidding written guidance to its members and other system operators on the requirements that need national decision.
In order to make the implementation...More
In 2015, ENTSO-E started the update of the conformity assessment scheme of the Common Grid model Exchange Standard (CGMES). This update was necessary in view of the CGMES being used in the implementation of the European network codes and guidelines on capacity allocation and congestion management...More
ENTSO-E represents 41 Transmission System Operators (TSOs) across 34 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet...More
ENTSO-E is developing methodologies for a common European grid model and the provision of data on generation and load. The development of both methodologies is required to implement the first adopted Network Code: the Capacity Allocation and Congestion Management (CACM) Regulation.
Grid...More
The Electricity Balancing network code is still under discussion and should be put to vote in 2016. As with other network codes, transmission system operators are engaged in projects that are implementing already some of the objectives of the future EU regulation on electricity balancing. One of...More
This consultation concerns a common proposal developed by all Transmission System Operators regarding intraday cross-zonal gate opening and intraday cross-zonal gate closure times (“IDCZGT Proposal”) in accordance with Article 59(1) of the Commission Regulation (EU) No 2015/1222 of 24 July...More
ENTSO-E has issued a draft of the Harmonised Allocation Rules (HAR) for public consultation. The HAR will apply for forward capacity allocation, subject to relevant approval from national regulators, and for allocated long term transmission rights with delivery date on 1st of January 2017 or...More
This consultation concerns a common proposal developed by all Transmission System Operators regarding the determination of single pan-European day-ahead firmness deadline (“DAFD”) in accordance with Article 69 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a...More
The CBA methodology is developed to evaluate the benefits and costs of TYNDP projects( transmission and storage) from a pan-European perspective, providing important input for the selection process of PCIs. The main objective of this CBA methodology is to provide a common and uniform basis for...More
The Roadmap 2017-2026 updates the ENTSO-E Research & Development Roadmap, by taking into account the new technological developments including in other sectors than transport of electricity (eg ICT, storage etc), the emerging of new actors (consumers, prosumers) as well as energy and research...More
The TYNDP is a biennial European network development exercise which electricity and gas ENTSOs are developing in line with the legal mandates (Regulations (EC) 714 and 715/2009).
Without a well-functioning market, adapted legislation and the proper infrastructure in place, Europe cannot...More
Europe currently has three connection network codes: Requirements of generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG already entered into force on 17 May with the remaining two expected to be enforced end summer 2016.
The Member States have the...More
The MAF 2016 presents the first Pan-European probabilistic assessment of adequacy . While market-based probabilistic modelling approaches have already been adopted in some national generation adequacy studies and the PLEF regional adequacy assessment, this is the first time such studies...More
In 2017, ENTSO-E will enter a new phase for several of its important legally mandated tasks. After almost seven years of development work, most of the network codes (NC) will have been adopted. This means that the focus shifts now to the many implementation tasks for all parties concerned, such...More
The ENTSO for gas and electricity had gathered in the past 6 month significant feedback from the stakeholders on the assumptions and storylines of the 2030 and 2040 scenarios for the TYNDPs 2018.
Now the ENTSOs invite you to express your view on how to interpret the feedback: e.g....More
This consultation concerns a common proposal regarding a methodology for calculating scheduled exchanges resulting from single day-ahead coupling in accordance with Article 43 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and...More
This consultation concerns a common proposal regarding a methodology for calculating scheduled exchanges resulting from single intraday coupling in accordance with Article 56 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and...More
This consultation concerns two regional TSO proposals for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. These two proposals together cover...More
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback...More
This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback...More
Europe currently has three connection network codes: Requirements of generators (RfG ), Demand Connection (DCC) and High Voltage Direct Current (HVDC ).
The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this...More
This consultation is performed by the TSOs cooperating in the international procurement of FCR. Filling in the questionnaire will take about 15 to 20 minutes of your time.
Many consultation questions are referring to explanations and examples described in the consultation document,...More