371 results
-
ALPACA – Common and Harmonized Rules and Processes for the Exchange and Procurement of Balancing Capacity for Automatic Frequency Restoration Reserves for AT-CZ in accordance with Article 33(1) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Common and Harmonized Rules and Processes for the Exchange and Procurement of Balancing Capacity for Automatic Frequency Restoration Reserves for CZ-DE in accordance with Article 33(1) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Methodology for Calculating the Probability of Available Cross-zonal Capacity after Intraday Cross-zonal Gate Closure Time in accordance with Article 33(6) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Algorithm to be Operated by the Capacity Procurement Optimization Function for the Procurement of Balancing Capacity Bids in accordance with Article 58(3) of Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
All TSOs’ proposal for amendment of the Determination of capacity calculation regions methodology in accordance with Article 15(1) of the CACM
The Single Electricity Market (SEM) of Ireland and Northern Ireland does not have an interconnector with European Union and, due to Brexit, the former IU CCR (SEM-GB CCR) no longer exists. The SEM is expected to be re-coupled with the EU in 2026, when the Celtic Interconnector is planned to go live. The Celtic Interconnector is a planned subsea HVDC 700 MW link to allow the exchange of electricity between SEM and France. Specifically, the 575 km interconnector is between Knockraha... MoreClosed 21 August 2023 -
Amendments to the Manual of Procedures (MoP v3r4) of the Transparency Platform
This consultation concerns the Manual of Procedures (MoP) of the Transparency Platform. The new release (MoP v3r4) includes amendments to the existing documents (Detailed Data Descriptions (DDD) and Business Requirements) to better reflect the new requirements of the Transparency platform. These amendments not only will bring more clarity to the current data publications with additional explanations/revisions but also will generate new data publication requirements on the ENTSO-E... MoreClosed 17 August 2023 -
Consultation on the ENTSO-E Annual Work Programme 2024
ENTSO-E publishes every year an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme 2024 reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 on the internal market for electricity and related Network Codes and Guidelines, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) No 2022/869 on guidelines for trans-European energy infrastructure,... MoreClosed 16 August 2023 -
TYNDP 2024 Scenarios Input Parameters
ENTSO-E and ENTSOG public consultation on the TYNDP 2024 Scenarios Input Parameters ENTSO-E and ENTSOG published their Storylines Report and several key underlying data sets and modeling methodologies as a first deliverable in the formal process for TYNDP 2024 scenario building, as required by Regulations 943/2019 and 715/2009. All stakeholders are invited to provide feedback until 8 August 2023. As part of ENTSO-E and ENTSOG’s goal of improved... MoreClosed 8 August 2023 -
TYNDP 2024 Guidance for promoters
In mid-September 2023, ENTSO-E will begin collecting applications from transmission and storage projects for the TYNDP 2024. To allow project promoters to prepare in advance of the submission period, ENTSO-E is releasing today a draft Guidance document and invites projects promoters and interested stakeholders to comment and raise questions. The Guidance specifies in particular: the procedure and the timeline for projects promoters to apply to the TYNDP 2024; ... MoreClosed 7 August 2023 -
Survey on harmonisation of terms and conditions related to the aFRR, mFRR and IN Platforms
With this annual survey Transmission System Operators (TSOs) ask stakeholders for input/response to evaluate the terms and conditions for Balancing Service Providers (BSP’s) in order to identify possible harmonization needs in the European balancing market. It concerns the terms and conditions according to article 18 of Regulation (EU) 2017/2195 establishing a guideline on electricity balancing. MoreClosed 24 July 2023 -
Have your say on the ENTSO-E's Annual Report 2022
This Annual Report covers the period from January to December 2022. It focuses on the legal mandates given to ENTSO-E and on the Pan-European All TSOs tasks, which are facilitated by ENTSO-E. While delivering legally mandated tasks, ENTSO-E also aims to support policy objectives, in particular the Green Deal, on a pan-European level. This ambition concerns all aspects of ENTSO-E’s work as the increase of variable renewable generation and the electrification of several sectors,... MoreClosed 21 July 2023 -
All TSOs’ proposal for amendments of the methodology for Harmonised Allocation Rules for long-term transmission rights
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules. The previous public consultation on HAR ending 22 May, was found not to comply with FCA regulation on public consultations, as it did not contain a concrete text proposal of the amended methodology. Therefore TSOs will conduct a new public... MoreClosed 8 July 2023 -
Public survey on the change of the number of clearings for the exchange of balancing energy from Replacement Reserves in accordance with Article 19 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing
This survey concerns the presentation of several options for the future RR process implemented in the LIBRA platform. Currently the process is based on 24 gates, but due to the regulation this number of gates must be increased to 48 or 96. It is proposed as a preliminary consultation to gather all public stakeholders’ feedbacks to select the best option. Another public consultation will follow to amend the Implementation Framework thanks to the chosen option . The proposal has been... MoreClosed 7 July 2023 -
First amendment of the Methodology for coordinated redispatching and countertrading for the SEE CCR
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for coordinated redispatching and countertrading for the capacity calculation region SEE in accordance with Article 35(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management MoreClosed 1 July 2023 -
First amendment of the Methodology for regional operational security coordination for the SEE CCR
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for regional operational security coordination for the capacity calculation region SEE pursuant to Article 76(1) of the Regulation (EU) 2017/1485 establishing a guideline on electricity transmission system operation. MoreClosed 1 July 2023 -
Update proposal of Methodology for Identifying Regional Electricity Crisis Scenarios
The “Methodology for Identifying Regional Electricity Crisis Scenarios” (the RP Methodology) was first approved by ACER in 2020 pursuant to Article 5 of Regulation (EU) 2019/941 of the European Parliament and of the Council on risk-preparedness in the electricity sector (RPR, link ). The methodology lays down a framework on how TSOs identify electricity crisis scenario candidates and how these should be assessed into regional electricity crisis scenarios. Article 5 of the RPR... MoreClosed 30 June 2023 -
Amendments proposals to the methodology for coordinating operational security analysis
Article 75 of Commission Regulation (EU) 2017/1485 of 2 August 2017 requires all TSOs to jointly develop a proposal for a methodology for coordinating operational security analysis. With this public consultation, TSOs would like to consult stakeholders on proposals of amendments to this methodology in accordance with Articles 7 and 11 of that Regulation. Several amendment proposals are motivated by the recommendations of the Investigation Panel on the separation of Continental... MoreClosed 30 June 2023 -
Methodology for performing the probabilistic dimensioning of FCR in CE synchronous area
This consultation is based on Article 11 of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (System Operation Guideline, SO GL) and concerns the dimensioning rules for FCR in accordance with Article 153 of the same Regulation. Article 153(2) of the SO GL provides the possibility for TSOs in CE SA to “define a probabilistic dimensioning approach for FCR taking into account the pattern of load, generation... MoreClosed 15 June 2023 -
Core CCR 2023 survey quality of the data published
Core CCR runs this survey about the quality of the provided data and the ease-of-use of data retrieval on the JAO platform. The aim is to gather the stakeholders’ feedback, which will assist Core TSOs in considering further improvements to be implemented. An overview of the survey results will be included in the annual report. MoreClosed 9 June 2023 -
Public consultation on TYNDP 2024 scope of studies and stakeholder engagement plan
Scope of this public consultation This public consultation covers the following studies that are part of the TYNDP 2024: the identification of system needs, and the cost-benefit analysis of projects. It also covers the stakeholder engagement plan for each study. Not in the scope of this consultation are scenarios, which follow a separate consultation process organised jointly with ENTSOG, with two public consultations planned in 2023. Also excluded from the scope of... MoreClosed 8 June 2023 -
All TSOs’ proposal for amendments of the methodology for Harmonised Allocation Rules for long-term transmission rights
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules. The current amendment proposal for HAR submitted to ACER 1 March contains general updates and several updates related to the introduction of LT FBA. The 1 March submission will be complemented and merged with a new submission 1 June containing a... MoreClosed 20 May 2023 -
Nordic Capacity Calculation Methodology External Parallel Run Evaluation Report
This consultation concerns an external parallel run evaluation report for assessment by the NRAs of the Nordic CCR, as required by the Nordic DA/ID CCM that was approved by the NRAs of the Nordic CCR on October 14th, 2020. Please note: restrictions in the web survey tool If you would like to illustrate your point using figures/graphs or if your response exceeds the word limit, please feel free to provide this information via e-mail to ccm@nordic-rcc.net . MoreClosed 17 May 2023 -
Pre-consultation on the ENTSO-E Annual Work Programme list of deliverables 2024
ENTSO-E publishes every year an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme 2024 reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 on the internal market for electricity and related Network Codes and Guidelines, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) No 2022/869 on guidelines for trans-European energy... MoreClosed 7 May 2023 -
Bidding Zone Study - Second Questionnaire on Transition Costs
In accordance with the ACER decision 29/2020 of 24 November 2020 on the methodology and assumptions that are to be used in the Bidding Zone Review process and for the alternative bidding zone configurations to be considered (BZR Methodology), Transmission System Operators ("TSOs") of all Bidding Zone Review Regions shall jointly perform a study in order to estimate transition costs occurring from a bidding zone reconfiguration. TSOs have launched a first questionnaire on transition... MoreClosed 23 April 2023 -
Baltic CCR TSOs’ revised proposal on the Balancing Timeframe Capacity Calculation Methodology
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity Calculation Methodology for the Balancing Timeframe for the Baltic Capacity Calculation Region. MoreClosed 21 April 2023 -
ERAA 2023 Call-for-Evidence on Preliminary Input Data
With the integration of Europe’s electricity markets, large-scale renewable capacity integration and shifting demand patterns on the path to European climate neutrality goals, resource adequacy will be in the spotlight for coming decades. ENTSO-E and its TSO members are continuously striving to enhance each ERAA edition with the feedback received by stakeholders, to ensure a swift and efficient implementation. The stepwise approach endorsed by ACER on 2 October 2020 is the basis for... MoreClosed 5 April 2023 -
Nordic TSOs' methodology for sharing and exchange limits of FRR/RR (amended)
This consultation concerns the amended methodology of all Nordic TSOs for sharing and exchange limits of FRR/RR between synchronous areas in accordance with Article 176(1), 177(1), 178(1) and 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). The main trigger for this amendment is the implementation of markets that allow for exchanging FRR energy and capacity between... MoreClosed 1 March 2023 -
Nordic TSOs' methodology for ramping restrictions for active power output (amended)
This consultation concerns the amended methodology of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). The main trigger for this amendment is the change from a Market Time Units (MTU) of 60 minutes to a MTU of 15 minutes in both the intraday market and day-ahead... MoreClosed 1 March 2023 -
Amendment proposal on Art. 15(1) of CCR Hansa ID/DA Capacity Calculation Methodology
This consultation concerns the amendment of the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the amendment of the Art. 15(1) of the capacity calculation methodology for Capacity Calculation Region Hansa MoreClosed 19 February 2023 -
ENTSO-E Connection Network Codes_revised Implementation Guidance Documents_January 2023
Background According to Article 58 of Network Code Requirements for Generators (NC RfG), Article 56 of Network Code Demand Connection (NC DC) and Article 75 of Network Code High Voltage Direct Current (NC HVDC), ENTSO-E has the obligation to prepare non-binding guidance on implementation which shall be maintained every two years. In the recent past, ENTSO-E produced (and when necessary improved later on) several Implementation Guidance... MoreClosed 16 February 2023
371 results.
Page 2 of 13