Find activities

377 results

  • Public Consultation on the ENTSO-E Research & Innovation Roadmap 2017-2026

    The Roadmap 2017-2026 updates the ENTSO-E Research & Development Roadmap, by taking into account the new technological developments including in other sectors than transport of electricity (eg ICT, storage etc), the emerging of new actors (consumers, prosumers) as well as energy and research policy developments according Energy Union . This Roadmap is one of ENTSO-E’s deliverables according to the EU regulation 714/2009, and will be subject to an opinion from ACER, the Agency for the... More
    Closed 24 May 2016
  • Intraday cross-zonal gate opening and gate closure times

    This consultation concerns a common proposal developed by all Transmission System Operators regarding intraday cross-zonal gate opening and intraday cross-zonal gate closure times (“IDCZGT Proposal”) in accordance with Article 59(1) of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). Together with the IDCZGT Proposal, a document outlining the background and rationale for the gate opening and... More
    Closed 18 May 2016
  • Harmonised Allocation Rules for Forward Capacity Allocation

    ENTSO-E has issued a draft of the Harmonised Allocation Rules (HAR) for public consultation. The HAR will apply for forward capacity allocation, subject to relevant approval from national regulators, and for allocated long term transmission rights with delivery date on 1st of January 2017 or later. The current version of the Harmonised Allocation Rules (HAR) is a result of the early implementation activities of the draft Forward Capacity Allocation (FCA) Regulation, which was voted by the... More
    Closed 18 May 2016
  • All TSOs’ proposal for the day-ahead firmness deadline (DAFD)

    This consultation concerns a common proposal developed by all Transmission System Operators regarding the determination of single pan-European day-ahead firmness deadline (“DAFD”) in accordance with Article 69 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Closed 18 May 2016
  • Public consultation for the design of the TERRE (Trans European Replacement Reserves Exchange)

    The Electricity Balancing network code is still under discussion and should be put to vote in 2016. As with other network codes, transmission system operators are engaged in projects that are implementing already some of the objectives of the future EU regulation on electricity balancing. One of these projects is called TERRE: Trans European Replacement Reserves Exchange. TERRE is about setting up and operating a multi-TSO platform capable of gathering all the offers for Replacement... More
    Closed 8 April 2016
  • Consultation on the Common Grid Model Methodology and the Generation and Load Data Provision Methodology

    ENTSO-E is developing methodologies for a common European grid model and the provision of data on generation and load. The development of both methodologies is required to implement the first adopted Network Code: the Capacity Allocation and Congestion Management (CACM) Regulation. Grid operators use computer models of their network to simulate its behaviour in order to make decisions. Results of these simulations are notably used to decide on the list of actions transmission system... More
    Closed 4 March 2016
  • Stakeholder Satisfaction Survey 2015

    ENTSO-E represents 41 Transmission System Operators (TSOs) across 34 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector, grid users, equipment manufacturers, service providers, generators,... More
    Closed 5 February 2016
  • ENTSO-E survey on priority issues for Connection Network Codes implementation guidance

    For all three Connection Network Codes ( RfG, DCC and HVDC) ENTSO-E shall deliver no later than 6 month after the entry into force non-bidding written guidance to its members and other system operators on the requirements that need national decision. In order to make the implementation guidance fit for purpose ENTSO-E would like to gather at an early stage all the relevant stakeholders' feedback on the priority issues. The current survey includes a list of issues already... More
    Closed 22 January 2016
  • Consultation on version 2 of ENTSO-E Conformity Assessment Scheme for CGMES

    In 2015, ENTSO-E started the update of the conformity assessment scheme of the Common Grid model Exchange Standard (CGMES). This update was necessary in view of the CGMES being used in the implementation of the European network codes and guidelines on capacity allocation and congestion management and system operation. The update includes additional tests and procedures before software applications can be validated as being conform for use by ENTSO-E or a transmission system operator... More
    Closed 15 January 2016
  • Capacity Calculation Regions

    This consultation concerns a common proposal developed by all Transmission System Operators regarding the determination of capacity calculation regions in accordance with Article 15 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Closed 24 September 2015
  • Have your say on the Annual Work Programme 2016

    ENTSO-E’s draft 7th Annual Work Programme for the period September 2015 to December 2016, is focusing in particular on our vision in response to the EC’s “Energy Union” initiative. At times of monumental changes in the European energy system, the Association recognises the need to deliver in two directions: with ENTSO-E priority contributions to electricity system and market; and adapting our Association to even better meet expectations of all Stakeholders and our Members. In... More
    Closed 24 September 2015
  • Have your say on the Regional Investment Plans 2015

    As part of the TYNDP 2016 package ENTSO-E prepared six Regional Investment Plans covering all Europe. These reports are looking at power system development issues from a regional perspective accounting for their particularities and closely coordinated at European level. The following six reports are put forward for consultation: 1. Regional Investment Plan North Sea 2. Regional Investment Plan Baltic Sea 3. Regional Investment Plan Continental Central East 4. ... More
    Closed 10 September 2015
  • Have your say to the TYNDP 2016 candidate projects

    The transmission and storage project promoters (ENTSO-E and non-ENTSO-E members) have submitted during April 2015 a number of candidate projects for inclusion in the TYNDP 2016. The submission process followed the EC guidelines for inclusion of projects in the TYNDP. Before starting the Cost Benefit Assessment of the TYNDP 2016 projects ENTSO-E invites all the interested stakeholders to express their views on the TYNDP 2016 candidate projects and the related reference capacities that... More
    Closed 10 September 2015
  • Coordination of technical cooperation between Community and third-country TSOs

    The Third Energy Package tasked ENTSO-E with providing “Recommendations relating to the coordination of technical cooperation between Community and third-country transmission system operators”. These recommendations mainly focus on transmission system operators (TSOs) which are not members of ENTSO-E, as the technical cooperation between ENTSO-E members is already well developed. The recommendation suggested by ENTSO-E and presented to stakeholders views in this consultation will not... More
    Closed 31 July 2015
  • ENTSO-E consults the stakeholders on the TYNDP 2016 scenarios development report

    Between 21 May to 22 June (inclusive) ENTSO-E runs the public consultation on the TYNDP 2016 scenarios development report . This public consultation is the third step of formal interraction with the stakeholders in order to build the TYNDP 2016 scenarios. This report incorporates 5 scenarios which will be further used by ENTSO-E to assess, accoring to the CBA methodology, all the pan-European significant projects of the TYNDP 2016. These scenarios reflect one best estimate 2020 future... More
    Closed 22 June 2015
  • Electricity Balancing Network Code: Methodology for Cost Benefit Analysis

    ENTSO-E welcomes stakeholders’ comments on a draft report describing the General Methodology for the Cost Benefit Analysis and on a draft scoping paper for a specific methodology for the Imbalance Settlement Period Harmonisation. The public consultation runs from 23 February until 31 March. The draft Network Code on Electricity Balancing (NC EB) requires a cost benefit analysis (CBA) to be undertaken in support of decisions relating to the European Integration Model, the Application of... More
    Closed 31 March 2015
  • Harmonised Allocation Rules for forward capacity allocation

    ENTSO-E has issued a draft of the Harmonised Allocation Rules (HAR) for public consultation. The HAR will apply for forward capacity allocation, subject to relevant approval from national regulators, and for allocated long term transmission rights which delivery date is 1 st of January 2016 or later. The draft HAR is the result of an ongoing early implementation project of the Network Code on Forward Capacity Allocation. In order to deliver this project, a stakeholder advisory group was... More
    Closed 31 March 2015
377 results. Page 13 of 13