Find activities

361 results

  • All TSOs proposal for amending the determination of LFC blocks for the Synchronous Area Continental Europe with regard to LFC Area Denmark West

    Energinet and TenneT GmbH have a long history of close cooperation on operational matters with the two companies being in the same LFC Block. Energinet has always operated Denmark West as an LFC Area with its own LFC. Any remaining imbalances have then been balanced by the TenneT LFC. The legal basis for this way of operating is currently a system operation agreement between the two TSOs. The close cooperation and the fact that Energinet acts as its own LFC Area has... More
    Opened 22 February 2021
  • Block Bids - A new approach for the allocation of long-term transmission rights

    Background & purpose Long-Term Transmission Rights (LTTRs) are commonly used by market participants to hedge their cross-border electricity transactions. During the Market European Stakeholder Committee meeting of 17 June 2020, some market participants requested that alongside the already existing standard LTTR-products for the yearly and monthly timeframe, a further LTTR allocation approach is considered in order to individualise hedging strategies and to align them to... More
    Opened 15 February 2021
  • Core Survey static grid model

    Core CCR runs this survey about the static grid model. The aim is to gather the market parties’ feedback to have more clarity on the needs and aimed usage, allowing Core TSOs to make an adequate proposal. More
    Opened 29 January 2021
  • Nordic TSOs' proposal on ramping restrictions

    This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). The connection of the new HVDC interconnectors NordLink (in 2020) and North Sea Link (NSL) (in 2021) are the trigger for the proposed amendments to the methodology.... More
    Opened 21 January 2021
  • HANSA CCR - Common Coordinated Long -Term Capacity Calculation Methodology Proposal (FCA Art. 10)

    This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodology (LTCCM) in accordance with Article 10(1) of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA). This proposal is an amendment to the already approved LTCCM in order to introduce provisions for the Kriegers-Flak combined grid solution. See EC decision on the derogation of the Kriegers Flak combined grid... More
    Opened 19 January 2021
  • Nordic TSOs' proposal on minimum activation period to be ensured by FCR providers

    This consultation concerns the proposal of all Nordic TSOs for the minimum activation period to be ensured by FCR providers in accordance with Article 156(10) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). This Proposal takes full account of the results of the cost-benefit analysis that has been conducted together with the TSOs of the CE synchronous area pursuant to... More
    Opened 14 December 2020
  • HANSA CCR - Common Coordinated Capacity Calculation Methodology Proposal (CACM Art. 20)

    This consultation concerns the regional TSOs’ proposal for common coordinated capacity calculation methodologies in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). This proposal applies to Capacity Calculation Region (CCR) Hansa and covers both the day-ahead and the intraday timeframe. More
    Opened 3 December 2020
  • HANSA CCR - Coordinated Redispatching and Countertrading Methodology Proposal (CACM Art. 35)

    This consultation concerns the regional TSOs’ proposal for common coordinated redispatching and countertrading methodology in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). This proposal applies to Capacity Calculation Region (CCR) Hansa. More
    Opened 3 December 2020
  • ENTSO-E Connection Network Codes_revised Implementation Guidance Documents_November 2020

    Background According to Article 58 of Network Code Requirements for Generators (NC RfG), Article 56 of Network Code Demand Connection (NC DC) and Article 75 of Network Code High Voltage Direct Current (NC HVDC), ENTSO-E has the obligation to prepare non-binding guidance on implementation which shall be maintained every two years. In the recent past, ENTSO-E produced (and when necessary improved later on) several Implementation Guidance... More
    Opened 2 December 2020
  • Consultation on proposal for exact balancing capacity gate closure time for common Nordic aFRR capacity market

    This consultation concerns exact balancing capacity gate closure time in accordance with Article 3 of ACER decision No 19/2020 of 5 August 2020 on the common and harmonised rules and processes for procurement and exchange of aFRR balancing capacity for the Nordic LFC Block. The proposal has been prepared by the TSOs of the Nordic LFC Block, being Energinet, Fingrid Oyj, Svenska kraftnät and Statnett SF. More
    Opened 18 November 2020
  • Ten-Year Network Development Plan (TYNDP) 2020

    ENTSO-E’s 10-year network development plan (TYNDP) is the pan-European electricity infrastructure development plan. It looks at the future power system in its entirety and at how power links and storage can be used to make the energy transition happen in a cost-effective and secure way. The TYNDP 2020 has been developed with the expertise of 35 European TSOs. With this consultation, ENTSO-E asks for feedback on: - the TYNDP 2020 report and Highlights - the Project... More
    Opened 6 November 2020
  • ENTSO-E - ENTSOG 2022 Scenario Storyline Consultation

    Regulation (EU) 347/2013 requires that ENTSO-E and ENTSOG use scenarios for their respective Ten- Year Network Development Plans (TYNDPs) 2022. The development of the scenarios marks the first step in the TYNDP 2022 process. Defining the scenarios in turn begins with the development of the (qualitative) storylines to be explored. In a webinar on the 3rd of July 2020 ENTSOG and ENTSO-E presented their first ideas for the TYNDP 2022 storylines. Several stakeholders provided... More
    Opened 3 November 2020
  • All RR TSOs' consultation on amended RRIF

    The TSOs performing the reserve replacement process ('RR TSOs') are launching a public consultation from 21 September to 21 October 2020 on their proposal for an amendment of the implementation framework for a European platform for the exchange of balancing energy from replacement reserves ('RRIF'). The RR TSOs seek stakeholders' views on the proposed amendment to the RRIF and, more generally, on the RR process. The RR TSOs propose the following changes: ... More
    Opened 21 September 2020
  • Core CCR – Long-Term Capacity Calculation Methodology

    This consultation is based on Article 10(1) of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the proposal for a common long-term capacity calculation methodology for the Core region. More
    Opened 16 September 2020
  • All TSOs proposal on definition of the capacity calculation regions

    This consultation concerns the determination of capacity calculation regions as defined in accordance with Article 15(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management. On 5 June 2020, ACER’s Director sent a request to the TSOs inviting all TSOs to prepare an updated CCRs proposal and formally submit it to ACER for approval, while TSOs agreed to fulfil this request. This CCRs... More
    Opened 19 August 2020
  • Amendments to the Coordinated Security Analysis methodology (SO GL Art. 75)

    This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). In accordance with the ACER Decision of June 2019 (link to ACER decision here ), Article 21 and Article 27 of CSAm shall be amended and submitted to ACER by 19 December 2020. The... More
    Opened 13 August 2020
  • Nordic TSOs’ proposal for ramping restrictions (amended)

    This consultation concerns the amended proposal of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). The new Nordlink interconnector between Norway and Germany requires an amendment to the proposal related to ramping restrictions that was approved by the Nordic NRAs in July... More
    Opened 3 August 2020
  • Fallback procedure for SEE Capacity Calculation Region

    This consultation concerns the regional TSO proposal for new proposal of Shadow Allocation Rules which are part of approved fallback procedures elaborated in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers Article 2(1), letter c) from fallback procedures for the SEE Capacity Calculation Region, borders (RO-BG and BG-GR). More
    Opened 28 July 2020
  • Channel CCR: 44 CACM – Amendment of the Channel CCR Fallback Procedures (incl. shadow allocation rules)

    This consultation concerns the Channel CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM). In cooperation with all other TSOs across Europe, Channel TSOs plan to amend the Shadow Allocation Rules 1.4 for the Channel CCR in order to merge them with other Shadow Allocation Rules currently applied across Europe into one set of Shadow Allocation Rules. Main changes out of this process are the... More
    Opened 24 July 2020
  • SWE CCR: 44 CACM – First amendment of the SWE CCR Fallback Procedures (incl. shadow allocation rules)

    This consultation concerns the SWE CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM). In cooperation with all other TSOs across Europe, SWE TSOs plan to amend the Regional Shadow Allocation Rules for the SWE CCR in order to merge them with other Shadow Allocation Rules currently applied across Europe into one set of Shadow Allocation Rules. Main changes out of this process are the harmonization... More
    Opened 24 July 2020
  • Fallback procedure for Greece-Italy Capacity Calculation Region

    This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Greece-Italy Capacity Calculation Region. More
    Opened 24 July 2020
  • Italy North CCR: 44 CACM – First amendment of the Italy North CCR Fallback Procedures (incl. shadow allocation rules)

    This consultation concerns the Italy North CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM). In cooperation with all other TSOs across Europe, Italy North TSOs plan to amend the Regional Shadow Allocation Rules for the Italy North CCR in order to merge them with other Shadow Allocation Rules currently applied across Europe into one set of Shadow Allocation Rules. Main changes out of this process are the... More
    Opened 24 July 2020
  • Core CCR: 44 CACM – First amendment of the Core CCR Fallback Procedures (incl. shadow allocation rules)

    This consultation concerns the Core CCR Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 (CACM). In cooperation with all other TSOs across Europe, Core TSOs plan to amend the Regional Shadow Allocation Rules for the Core CCR in order to merge them with other Shadow Allocation Rules currently applied across Europe into one set of Shadow Allocation Rules. Main changes out of this process are the harmonization of processes... More
    Opened 24 July 2020
  • EU Shadow Allocation Rules – Amendment – CCR Hansa and NO-borders Public Consultation

    This consultation concerns the all-TSO Proposal for the amendment, dated from 30/06/2020, of the EU Shadow Allocation Rules (EU SAR). In cooperation with all other TSOs across Europe, Hansa TSOs and Statnett plan to amend the Shadow Allocation Rules for the Hansa CCR and NO-borders in order to merge them with the Regional Shadow Allocation Rules currently applied across Europe into one set of Shadow Allocation Rules. Main changes out of this process are the... More
    Opened 24 July 2020
  • Have your say on ENTSO-E's Annual Work Programme 2021

    ENTSO-E's draft Annual Work Programme details our planned activities from January to December 2021 as per Art. 30.1(i) and 30.4 of Regulation 2019/943. The Annual Work Programme focuses on ENTSO-E's legal mandates in the areas of System Operations, Markets, System Development, Transparency Regulation, Research & Development, TSO, DSO and Demand Side Flexibility and Cybersecurity, Interoperability and Data. More
    Opened 1 July 2020
  • ENTSO-E Research & Development & Innovation Roadmap 2020-2030

    This public consultation aims to collect stakeholders feedback on ENTSO-E draft Research & Development & Innovation Roadmap for 2020-2030 . This deliverable is a requested by article 30 of Regulation 2019/943. The publication can be found via this link and below, under related links. More
    Opened 29 June 2020
  • Core TSOs' proposal for the 1st amendment of the Day-Ahead Flow-based Capacity Calculation Methodology

    This consultation concerns the Core CCR TSOs’ proposal for the first amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015 establishing a guideline on capacity allocation and congestion management. More
    Opened 25 June 2020
  • Have your say on the ENTSO-E's Annual Report 2019

    ENTSO-E's Annual Report 2019 describes our activities from January 2019 to December 2019. It focuses on the legal mandates given to ENTSO-E . 2019 was marked by the entry into force of the Clean Energy Package (CEP). While ENTSO-E and TSOs are still implementing the Third Package , work has already begun in 2019 on new legal mandates stemming from the CEP. More
    Opened 22 June 2020
  • Greece-Italy TSOs’ proposal on the day-ahead and intraday common capacity calculation methodology

    This consultation concerns the regional TSOs’ proposal of common capacity calculation methodology for the day-ahead and intraday market timeframe in accordance with Article 21 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). This proposal is amending the methodology approved by Greece-Italy NRAs on 12/07/2018 by considering the provisions of the Commission Regulation (EC) 2019/943 of 5 June... More
    Opened 26 May 2020
  • Draft methodology on the Use of Congestion Income

    Congestion income represents the revenue transmission system operators (hereafter referred to as “TSOs”) collect when allocating cross-zonal capacity. Within the Regulation (EU) 2019/943 of 5 June 2019 on the internal market for electricity, Article 19 establishes that revenues resulting from the allocation of cross-zonal capacity shall be used in priority for guaranteeing the actual availability of the allocated capacity, or maintaining or increasing cross-zonal capacities... More
    Opened 20 March 2020
361 results. Page 5 of 12