Find activities

381 results

  • Nomination Rules for Physical Transmission Rights

    Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on a bidding zone boder shall submit a proposal for the respective nomination rules. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability... More
    Closed 18 August 2017
  • Capacity Calculation Methodology for the Nordic CCR – Legal proposal

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. After having had a consultation on the capacity calculation methodology in April this consultation focuses on the legal proposal, meaning the legally-binding description of the capacity calculation methodology. More
    Closed 18 August 2017
  • Capacity Calculation Region Nordic’s proposal for regional design of long-term transmission rights

    This consultation concerns the regional TSO proposal for the regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the Regional design of long-term transmission rights for Capacity Calculation Region Nordic More
    Closed 27 August 2017
  • Capacity Calculation Methodology Proposal for the IU CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Ireland and United Kingdom Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Ireland and United KingdomCCR. More
    Closed 31 August 2017
  • Capacity Calculation Methodology Proposal for the Greece-Italy Capacity Calculation Region

    This consultation concerns the regional TSOs proposal for the common capacity calculation performed for the capacity allocation within the day-ahead and intraday market timeframes. This proposal is required by Article 20 (2) and developed in accordance with Article 21 of Regulation (EU) 2015/1222 on Capacity Allocation and Congestion Management. More
    Closed 9 September 2017
  • Capacity Calculation Methodology Proposal for the Baltic CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Baltic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Baltic CCR. More
    Closed 11 September 2017
  • Have your say on ENTSO-E's Annual Work Programme 2018

    This Annual Work Programme covers the period from September 2017 through the end of 2018. It builds on the obligations under ENTSO-E’s legal mandate and ENTSO-E’s strategic objectives as defined by the Board on a yearly basis. Responding to our obligations under the Third Legislative Energy Package, this programme focuses largely on the implementation of those tasks listed in the package. More
    Closed 20 September 2017
  • Capacity Calculation Region Baltic’s proposal for regional design of long-term transmission rights

    This consultation concerns All Baltic CCR TSOs’ Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA Regulation). This proposal covers the Regional design of long-term transmission rights for Capacity Calculation Region Baltic. More
    Closed 1 October 2017
  • Mid-term Adequacy Forecast 2017

    Generation not sole factor for EU security of electricity supply: interconnection, flexibility & policy coordination equally important Will demand for power in Europe be covered in the next decade? What is the impact of climate on our power system? Why interdependency between European countries is essential in assessing security of supply? Why coordination at all levels is necessary? These are questions addressed in the new edition of ENTSO-E’s Midterm Adequacy Forecast: a... More
    Closed 10 November 2017
  • ENTSOs consult the stakeholders on the TYNDP 2018 Scenario Report

    Between 2nd October 2017 and 10th November 2017 (inclusive) the ENTSOs for Electricity and Gas run the public consultation on their TYNDP 2018 Scenario Report. This public consultation is part of the overall formal interaction with stakeholders in order to build the scenarios. Through this consultation the ENTSOs are looking forward to hearing your opinion on the approach, assumptions and draft results presented in the Scenario Report. Click here to view the Scenario Report ... More
    Closed 10 November 2017
  • Core CCR - Regional Design of LTTRs including the CZ/SK and AT-DE/LU bidding zone borders

    The consultation concerns the CCR Core TSOs’ proposal for regional design of long-term transmission rights in accordance with Article 31(3) following the decision of concerned NRAs in accordance with Article 30(2) and its subsequent amendment based on Article 4(12) of Commission Regulation (EU) 2016/1719 (FCA Regulation). This proposal covers the design of Long Term Transmission Rights for the CCR Core. TSOs of the CCR Core (50HERTZ, AMPRION, APG, CREOS, ČEPS, ELES, ELIA, HOPS, MAVIR,... More
    Closed 21 November 2017
  • All TSOs' proposal for the key organisational requirements, roles and responsibilities in relation to data exchange

    This consultation concerns the all TSOs' proposal for key organisational requirements, roles and responsibilities in relation to data exchange (KORRR proposal) developed in accordance with article 40(6) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SOGL requires all TSOs to jointly agree, by 6 months after entry into force of SOGL, on key organisational requirements, roles and responsibilities in... More
    Closed 1 December 2017
  • Scheduled Exchanges Calculation Methodology (ID)

    This consultation concerns the All TSOs' proposal regarding the methodology for calculating scheduled exchanges resulting from single intraday coupling in accordance with Article 56 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Closed 3 December 2017
  • Scheduled Exchanges Calculation Methodology (DA)

    This consultation concerns the All-TSOs proposal regarding the methodology for calculating scheduled exchanges resulting from single day-ahead coupling in accordance with Article 43 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Closed 3 December 2017
  • CGMM-v3 (Common Grid Model Methodology pursuant to Regulation 2017/1485)

    The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Articles 67(1) and 70(1) of Commission Regulation (EU) 2017/1485 of 02 August 2017 establishing a guideline on electricity transmission system operation or "CGMM-v3" (i.e., also incorporating the requirements set out in the System Operation Guideline). More
    Closed 6 December 2017
  • SEE CCR TSOs’ proposal of common capacity calculation methodology for the day-ahead and intraday market timeframe

    The consultation concerns the regional TSOs proposal for SEE CCR Capacity Calculation Methodology in accordance with Article 21 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management. More
    Closed 14 December 2017
  • MARI - mFRR Platform Design - First Consultation - Call for Input

    This consultation deals with the design aspects defined by the MARI (Manually Activated Reserves Initiative) project which aims at setting the common European manual frequency restoration reserves (mFRR) platform following the Guideline on Electricity Balancing (GLEB), approved by EU Member States on March 16th 2017 and expected to enter into force in winter 2017/2018. The involved TSOs (19 members, 10 observers) see the task of the creation of one European wide mFRR platform as crucial... More
    Closed 20 December 2017
  • All TSOs' proposal for amendment to include upcoming interconnections in the decision on capacity calculation regions

    This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance with the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management ("CACM Regulation"). The proposed amendment requests focuses on... More
    Closed 20 December 2017
  • ENTSO-E Connection Codes Implementation Guidance Documents_Frequency Stability Parameters

    Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called... More
    Closed 21 December 2017
  • Common proposal for determination of the LFC blocks in the synchronous area of Great Britain

    This consultation concerns the proposal regarding the determination of LFC blocks in Great Britain synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: (a) a... More
    Closed 29 December 2017
  • Common proposal for determination of the LFC blocks in Continental Europe synchronous area

    This consultation concerns the proposal regarding the determination of LFC blocks in Continental Europe synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: ... More
    Closed 29 December 2017
  • Common proposal for determination of the LFC blocks in synchronous area of Ireland and Northern Ireland

    This consultation concerns the proposal regarding the determination of LFC blocks in the synchronous area of Ireland and Northern Ireland developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following... More
    Closed 8 January 2018
  • Channel TSOs methodology for Coordinated Redispatching and Countertrading

    This consultation concerns the regional TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management More
    Closed 12 January 2018
  • Coordinated redispatching and countertrading methodology for Capacity Calculation Region Hansa

    This consultation concerns the regional TSO proposal for the coordinated redispatching and countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the coordinated redispatching and countertrading methodology for Capacity Calculation Region Hansa. More
    Closed 28 January 2018
  • Stakeholder Satisfaction Survey 2017

    ENTSO-E represents 43 Transmission System Operators (TSOs) for electricity across 36 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,... More
    Closed 31 January 2018
  • Draft proposal for a coordinated redispatching and countertrading methodology for the Nordic CCR

    This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Nordic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). More
    Closed 2 February 2018
  • IU TSOs methodology for Coordinated Redispatching and Countertrading

    This consultation concerns the IU TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. More
    Closed 12 February 2018
  • Proposal for FCR cooperation market design

    This stakeholder consultation concerns the Frequency Containment Reserve (FCR) cooperation draft proposal for the market design and is performed in accordance with article 10 of the guideline on electricity balancing (GLEB). Article 33 of GLEB provides that TSOs exchanging balancing capacity shall develop a proposal for the establishment of common and harmonised rules and processes for the exchange and procurement of balancing capacity. This stakeholder consultation also includes a... More
    Closed 15 February 2018
  • All Continental European and Nordic TSOs’ proposal for a Cost Benefit Analysis methodology

    This consultation concerns the proposal on the assumptions and methodology for a cost-benefit analysis to be conducted, in order to assess the time period required for FCR providing units or groups with limited energy reservoirs to remain available during alert state, developed in accordance with article 156(11) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that, by 6 months after... More
    Closed 18 February 2018
  • Channel TSOs proposal for fallback procedures in accordance with CACM

    This consultation concerns the Channel TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management More
    Closed 19 February 2018
381 results. Page 3 of 13