This consultation concerns the Core CCR TSOs’ proposal for the regional design of the day-ahead common capacity calculation methodology in accordance with Article 20 ff. of Commission Regulation (EU) 2015/1222 of 24 July 2015.
This proposal covers the intraday capacity calculation...More
This consultation concerns the Core CCR TSOs’ proposal for the regional design of the day-ahead common capacity calculation methodology in accordance with Article 20 ff. of Commission Regulation (EU) 2015/1222 of 24 July 2015.
This proposal covers the day-ahead capacity calculation...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. After having had a...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Ireland and United Kingdom Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation...More
This Annual Work Programme covers the period from September 2017 through the end of 2018. It builds on the obligations under ENTSO-E’s legal mandate and ENTSO-E’s strategic objectives as defined by the Board on a yearly basis. Responding to our obligations under the Third Legislative Energy...More
This consultation concerns the regional TSOs proposal for the common capacity calculation performed for the capacity allocation within the day-ahead and intraday market timeframes. This proposal is required by Article 20 (2) and developed in accordance with Article 21 of Regulation (EU) 2015/1222...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Baltic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers...More
This consultation concerns All Baltic CCR TSOs’ Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA Regulation). This...More
Generation not sole factor for EU security of electricity supply: interconnection, flexibility & policy coordination equally important
Will demand for power in Europe be covered in the next decade? What is the impact of climate on our power system? Why interdependency between European...More
Between 2nd October 2017 and 10th November 2017 (inclusive) the ENTSOs for Electricity and Gas run the public consultation on their TYNDP 2018 Scenario Report. This public consultation is part of the overall formal interaction with stakeholders in order to build the scenarios.
Through this...More
The consultation concerns the CCR Core TSOs’ proposal for regional design of long-term transmission rights in accordance with Article 31(3) following the decision of concerned NRAs in accordance with Article 30(2) and its subsequent amendment based on Article 4(12) of Commission Regulation...More
This consultation concerns the all TSOs' proposal for key organisational requirements, roles and responsibilities in relation to data exchange (KORRR proposal) developed in accordance with article 40(6) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on...More
This consultation concerns the All TSOs' proposal regarding the methodology for calculating scheduled exchanges resulting from single intraday coupling in accordance with Article 56 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and...More
This consultation concerns the All-TSOs proposal regarding the methodology for calculating scheduled exchanges resulting from single day-ahead coupling in accordance with Article 43 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and...More
The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Articles 67(1) and 70(1) of Commission Regulation (EU) 2017/1485 of 02 August 2017 establishing a guideline on electricity transmission system operation or "CGMM-v3" (i.e.,...More
The consultation concerns the regional TSOs proposal for SEE CCR Capacity Calculation Methodology in accordance with Article 21 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management.
More
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance...More
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016.
The Member States have the obligation...More
This consultation deals with the design aspects defined by the MARI (Manually Activated Reserves Initiative) project which aims at setting the common European manual frequency restoration reserves (mFRR) platform following the Guideline on Electricity Balancing (GLEB), approved by EU Member...More
This consultation concerns the proposal regarding the determination of LFC blocks in Great Britain synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL)....More
This consultation concerns the proposal regarding the determination of LFC blocks in the synchronous area of Ireland and Northern Ireland developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission...More
This consultation concerns the proposal regarding the determination of LFC blocks in Continental Europe synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the regional TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
More
This consultation concerns the regional TSO proposal for the coordinated redispatching and countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal...More
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Nordic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation...More
This consultation concerns the proposal on the assumptions and methodology for a cost-benefit analysis to be conducted, in order to assess the time period required for FCR providing units or groups with limited energy reservoirs to remain available during alert state, developed in accordance with...More
ENTSO-E represents 43 Transmission System Operators (TSOs) for electricity across 36 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of...More
This consultation concerns the IU TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management.
More
This consultation concerns all TSOs’ proposal for the implementation framework for a European platform for the imbalance netting process in accordance with Article 22 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing
More
This stakeholder consultation concerns the Frequency Containment Reserve (FCR) cooperation draft proposal for the market design and is performed in accordance with article 10 of the guideline on electricity balancing (GLEB). Article 33 of GLEB provides that TSOs exchanging balancing capacity...More