377 results
-
Amendments to the “Regional Specific Annex for CCR Core to the Harmonised Allocation Rules for long-term transmission rights” (ie. EU HAR Annex 1)
This consultation concerns the Core CCR TSOs’ proposal for required by them amendments to the Regional Specific Annex for the CCR Core to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (FCA Regulation). The amendments compared to the approved by all Core NRAs regional annex currently in place are highlighted in the “Track... MoreClosed 12 April 2018 -
Common proposal for determination of the LFC blocks in the Nordic synchronous area
This consultation concerns the proposal regarding the determination of LFC blocks in the Nordic synchronous area developed in accordance with article 141(2) of commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: (a) a... MoreClosed 9 April 2018 -
Estonia-Latvia Bidding Zone Border Specific Annex for the Baltic CCR to the All TSOs' Proposal for Harmonised Allocation Rules for Long-term Transmission Rights
This consultation concern updated specific requirements applicable to the Baltic CCR at the Estonia-Latvia Bidding Zone border level pursuant to Article 52(3) of the FCA Regulation. MoreClosed 6 April 2018 -
All TSOs proposal for a methodology for coordinating operational security analysis
This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs shall jointly develop the methodology by 12 months after entry into force of SO GL, 14 September 2018. The methodology aims at the standardisationof operational... MoreClosed 6 April 2018 -
All TSOs’ proposal for a methodology for assessing the relevance of assets for outage coordination
This consultation concerns the all TSOs proposal for the methodology for assessing the relevance of assets for outage coordination developed in accordance with article 84(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs jointly develop a methodology for assessing the relevance for the outage coordination of power generating modules, demand facilities, and grid elements... MoreClosed 6 April 2018 -
Proposal of all TSOs performing the reserve replacement process for the implementation framework for a European Platform for the exchange of balancing energy from Replacement Reserves
This consultation concerns the proposal of all TSOs performing the reserve replacement process for the implementation framework for European Platform for the exchange of balancing energy from Replacement Reserves in accordance with Article 19 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing MoreClosed 4 April 2018 -
Italy North TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the Italy North TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreClosed 23 March 2018 -
Italy North TSOs' proposal on the day-ahead Capacity Calculation Methodology
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for the day-ahead timeframe for the Italy North CCR. MoreClosed 23 March 2018 -
Italy North TSOs' proposal on the intraday Capacity Calculation Methodology
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for the intraday timeframe for the Italy North CCR. MoreClosed 23 March 2018 -
Proposal for the implementation framework for a European platform for the imbalance netting process
This consultation concerns all TSOs’ proposal for the implementation framework for a European platform for the imbalance netting process in accordance with Article 22 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing MoreClosed 15 March 2018 -
Greece-Italy TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the Greece-Italy TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreClosed 11 March 2018 -
First Edition Bidding Zone Review
This consultation concerns a common proposal developed by the TSOs of Austria, Belgium, the Czech Republic, Denmark, France, Germany, Hungary, Italy, Luxembourg, the Netherlands, Poland, Slovakia and Slovenia regarding the Review of the existing bidding zone configurations in accordance with Article 32 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). MoreClosed 9 March 2018 -
Coordinated Redispatching and Countertrading methodology for SEE CCR TSOs in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
The consultation concerns the regional TSOs proposal for SEE CCR Coordinated Redispatching and Countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management. MoreClosed 4 March 2018 -
ENTSO-E Connection Network Codes Implementation Guidance Documents_Cost Benefit Analysis
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the relevant system operators or TSOs have 2 years to define and submit the national... MoreClosed 2 March 2018 -
Regional Investment Plans and System Needs Analysis 2040
As part of the TYNDP 2018 package ENTSO-E prepared six Regional Investment Plans covering all Europe. These reports are looking at power system development issues from a regional perspective accounting for their particularities and closely coordinated at European level. The European Power System 2040 report is a new report which takes a holistic view on the Pan-European investment needs. The Consultation documents can be found HERE MoreClosed 28 February 2018 -
Methodology for Coordinated Redispatching and Countertrading on SWE (South West Europe)
This consultation concerns the common proposal developed by RTE, REE and REN as the Transmission System Operators of the SWE Capacity Calculation Region regarding the proposal for the methodology for coordinated redispatching and countertrading in accordance with the Commission Regulation (EU) 2015/1222 (CACM Regulation). MoreClosed 25 February 2018 -
All Baltic CCR TSOs’ common methodology for coordinated redispatching and countertrading
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Baltic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). MoreClosed 22 February 2018 -
Channel TSOs proposal for fallback procedures in accordance with CACM
This consultation concerns the Channel TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management MoreClosed 19 February 2018 -
All Continental European and Nordic TSOs’ proposal for a Cost Benefit Analysis methodology
This consultation concerns the proposal on the assumptions and methodology for a cost-benefit analysis to be conducted, in order to assess the time period required for FCR providing units or groups with limited energy reservoirs to remain available during alert state, developed in accordance with article 156(11) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that, by 6 months after... MoreClosed 18 February 2018 -
Proposal for FCR cooperation market design
This stakeholder consultation concerns the Frequency Containment Reserve (FCR) cooperation draft proposal for the market design and is performed in accordance with article 10 of the guideline on electricity balancing (GLEB). Article 33 of GLEB provides that TSOs exchanging balancing capacity shall develop a proposal for the establishment of common and harmonised rules and processes for the exchange and procurement of balancing capacity. This stakeholder consultation also includes a... MoreClosed 15 February 2018 -
IU TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the IU TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreClosed 12 February 2018 -
Draft proposal for a coordinated redispatching and countertrading methodology for the Nordic CCR
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Nordic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). MoreClosed 2 February 2018 -
Stakeholder Satisfaction Survey 2017
ENTSO-E represents 43 Transmission System Operators (TSOs) for electricity across 36 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,... MoreClosed 31 January 2018 -
Coordinated redispatching and countertrading methodology for Capacity Calculation Region Hansa
This consultation concerns the regional TSO proposal for the coordinated redispatching and countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the coordinated redispatching and countertrading methodology for Capacity Calculation Region Hansa. MoreClosed 28 January 2018 -
Channel TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the regional TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management MoreClosed 12 January 2018 -
Common proposal for determination of the LFC blocks in synchronous area of Ireland and Northern Ireland
This consultation concerns the proposal regarding the determination of LFC blocks in the synchronous area of Ireland and Northern Ireland developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following... MoreClosed 8 January 2018 -
Common proposal for determination of the LFC blocks in the synchronous area of Great Britain
This consultation concerns the proposal regarding the determination of LFC blocks in Great Britain synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: (a) a... MoreClosed 29 December 2017 -
Common proposal for determination of the LFC blocks in Continental Europe synchronous area
This consultation concerns the proposal regarding the determination of LFC blocks in Continental Europe synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: ... MoreClosed 29 December 2017 -
ENTSO-E Connection Codes Implementation Guidance Documents_Frequency Stability Parameters
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called... MoreClosed 21 December 2017 -
MARI - mFRR Platform Design - First Consultation - Call for Input
This consultation deals with the design aspects defined by the MARI (Manually Activated Reserves Initiative) project which aims at setting the common European manual frequency restoration reserves (mFRR) platform following the Guideline on Electricity Balancing (GLEB), approved by EU Member States on March 16th 2017 and expected to enter into force in winter 2017/2018. The involved TSOs (19 members, 10 observers) see the task of the creation of one European wide mFRR platform as crucial... MoreClosed 20 December 2017
377 results.
Page 10 of 13