382 results
-
All Baltic CCR TSOs’ common methodology for coordinated redispatching and countertrading
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Baltic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). MoreClosed 22 February 2018 -
Methodology for Coordinated Redispatching and Countertrading on SWE (South West Europe)
This consultation concerns the common proposal developed by RTE, REE and REN as the Transmission System Operators of the SWE Capacity Calculation Region regarding the proposal for the methodology for coordinated redispatching and countertrading in accordance with the Commission Regulation (EU) 2015/1222 (CACM Regulation). MoreClosed 25 February 2018 -
Regional Investment Plans and System Needs Analysis 2040
As part of the TYNDP 2018 package ENTSO-E prepared six Regional Investment Plans covering all Europe. These reports are looking at power system development issues from a regional perspective accounting for their particularities and closely coordinated at European level. The European Power System 2040 report is a new report which takes a holistic view on the Pan-European investment needs. The Consultation documents can be found HERE MoreClosed 28 February 2018 -
ENTSO-E Connection Network Codes Implementation Guidance Documents_Cost Benefit Analysis
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the relevant system operators or TSOs have 2 years to define and submit the national... MoreClosed 2 March 2018 -
Coordinated Redispatching and Countertrading methodology for SEE CCR TSOs in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
The consultation concerns the regional TSOs proposal for SEE CCR Coordinated Redispatching and Countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management. MoreClosed 4 March 2018 -
First Edition Bidding Zone Review
This consultation concerns a common proposal developed by the TSOs of Austria, Belgium, the Czech Republic, Denmark, France, Germany, Hungary, Italy, Luxembourg, the Netherlands, Poland, Slovakia and Slovenia regarding the Review of the existing bidding zone configurations in accordance with Article 32 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). MoreClosed 9 March 2018 -
Greece-Italy TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the Greece-Italy TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreClosed 11 March 2018 -
Proposal for the implementation framework for a European platform for the imbalance netting process
This consultation concerns all TSOs’ proposal for the implementation framework for a European platform for the imbalance netting process in accordance with Article 22 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing MoreClosed 15 March 2018 -
Italy North TSOs methodology for Coordinated Redispatching and Countertrading
This consultation concerns the Italy North TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreClosed 23 March 2018 -
Italy North TSOs' proposal on the day-ahead Capacity Calculation Methodology
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for the day-ahead timeframe for the Italy North CCR. MoreClosed 23 March 2018 -
Italy North TSOs' proposal on the intraday Capacity Calculation Methodology
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for the intraday timeframe for the Italy North CCR. MoreClosed 23 March 2018 -
Proposal of all TSOs performing the reserve replacement process for the implementation framework for a European Platform for the exchange of balancing energy from Replacement Reserves
This consultation concerns the proposal of all TSOs performing the reserve replacement process for the implementation framework for European Platform for the exchange of balancing energy from Replacement Reserves in accordance with Article 19 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing MoreClosed 4 April 2018 -
Estonia-Latvia Bidding Zone Border Specific Annex for the Baltic CCR to the All TSOs' Proposal for Harmonised Allocation Rules for Long-term Transmission Rights
This consultation concern updated specific requirements applicable to the Baltic CCR at the Estonia-Latvia Bidding Zone border level pursuant to Article 52(3) of the FCA Regulation. MoreClosed 6 April 2018 -
All TSOs proposal for a methodology for coordinating operational security analysis
This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs shall jointly develop the methodology by 12 months after entry into force of SO GL, 14 September 2018. The methodology aims at the standardisationof operational... MoreClosed 6 April 2018 -
All TSOs’ proposal for a methodology for assessing the relevance of assets for outage coordination
This consultation concerns the all TSOs proposal for the methodology for assessing the relevance of assets for outage coordination developed in accordance with article 84(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs jointly develop a methodology for assessing the relevance for the outage coordination of power generating modules, demand facilities, and grid elements... MoreClosed 6 April 2018 -
Common proposal for determination of the LFC blocks in the Nordic synchronous area
This consultation concerns the proposal regarding the determination of LFC blocks in the Nordic synchronous area developed in accordance with article 141(2) of commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs of a synchronous area shall jointly develop a common proposal regarding the determination of the LFC blocks, which shall comply with the following requirements: (a) a... MoreClosed 9 April 2018 -
Amendments to the “Regional Specific Annex for CCR Core to the Harmonised Allocation Rules for long-term transmission rights” (ie. EU HAR Annex 1)
This consultation concerns the Core CCR TSOs’ proposal for required by them amendments to the Regional Specific Annex for the CCR Core to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (FCA Regulation). The amendments compared to the approved by all Core NRAs regional annex currently in place are highlighted in the “Track... MoreClosed 12 April 2018 -
Synchronous Area Operational Agreement Policy 1 Load Frequency Control and Reserves
This consultation concerns the TSOs in Continental Europe proposal for the Synchronous Area Operational Agreement on Load Frequency Control and Reserves developed in accordance with article 118 of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO GL requires that all TSOs shall develop Synchronous Area Operational Agreements by 12 months after entry into force of SO GL, 14 September 2018. This... MoreClosed 3 May 2018 -
ENTSO-E Connection Network Codes Implementation Guidance Documents_HVDC related topics
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 7 September 2016 and the HVDC on 28 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the relevant system operators or TSOs have 2 years to define and submit the national... MoreClosed 4 May 2018 -
Nordic TSOs’ request for amendments in accordance with Article 9(13) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management on Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57
The consultation concerns the CCR Nordic TSOs' request for amendment in accordance with Article 9(13) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation) concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57. This request for amendment covers the Multi-NEMO-Arrangement for the Capacity Calculation Region Nordic. To accompany the legal document, an... MoreClosed 17 May 2018 -
Synchronous Area Operational Agreements and LFC Block Operational Agreements for Great Britain
This consultation concerns the NGET proposals for the Synchronous Area Operational Agreements and LFC Block Operational Agreements on Load Frequency Control and Reserves developed in accordance with articles 118 and 119 respectively of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SOGL). SOGL requires that TSOs of the synchronous area responsible for operating load frequency control and reserves, which for... MoreClosed 18 May 2018 -
TYNDP 2018 Additional Benefits
This consultation is opened as a platform to add additional benefits which were not included in the ENTSOE approved additional benefits list. These benefits will be reviewed and a decision will be made on which benefits should be added to the approved list. Please see below the ' Guidance for the monetisation/justification of additional benefits' . MoreClosed 8 June 2018 -
Implementation framework for the exchange of balancing energy from frequency restoration reserves with automatic activation
This consultation concerns the “All TSOs’ proposal for the implementation framework for the exchange of balancing energy from frequency restoration reserves with automatic activation in accordance with Article 21 of Commission Regulation (EU) 2017/2195 establishing a guideline on electricity balancing”. MoreClosed 29 June 2018 -
Nordic TSOs’ proposals for frequency quality and FCR related methodologies for the Nordic synchronous area
This consultation concerns the proposals of all Nordic TSOs for four methodologies related to frequency quality and Frequency Containment Reserves (FCR) as required by Article 118(1) of the commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). These methodologies include: 118(1)(a) the dimensioning rules for FCR in accordance with Article 153; 118(1)(b) additional properties of FCR in accordance with... MoreClosed 1 July 2018 -
All TSOs proposal for a European platform for the exchange of balancing energy from frequency restoration reserves with manual activation implementation framework
This consultation concerns all TSOs’ proposal for a European platform for the exchange of balancing energy from frequency restoration reserves with manual activation in accordance with Article 20 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. MoreClosed 16 July 2018 -
Nordic TSOs’ proposals for FRR and FRCE and frequency quality related methodologies
This consultation concerns the proposals of all Nordic TSOs for four methodologies related to Frequency Restoration Reserves (FRR), Frequency Restoration Control Error (FRCE) and frequency quality as required by Article 118(1) and 119(1) of the commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). These methodologies include: 118(1)(z) and (aa): Methodology to determine limits on the amount of exchange... MoreClosed 15 August 2018 -
Consultation for Great Britain - Synchronous Area Operational Methodology, LFC Block Operational Methodology, LFC Area Operational Methodology and Monitoring Area Operational Methodology
This consultation concerns the NGET proposals relevant to GB for the Synchronous Area Operational Methodologies (SAOM), LFC Block Operational Methodologies (LFCBOAM), LFC Operational Area Methodology (LOAM) and Monitoring Area Operational Methodology (MAOM) on from Part IV of the SOGL regulation on Load Frequency Control and Reserves. These have been developed in accordance with Articles 118, 119, 120 and 121 respectively of the Commission Regulation (EU) 2017/1485 of 2 August 2017... MoreClosed 26 August 2018 -
2020 Scenario Storylines
The ENTSOs present the proposed 2020 Scenario Storylines for public consultation. In this consultation stakeholders are given the chance to comment on the ENTSOs storyline assumptions and vote on the storylines using the ranking system. All stakeholder inputs are valuable to the ENTSOs and are important for our development process. MoreClosed 14 September 2018 -
Have your say on ENTSO-E's annual work programme 2019
ENTSO-E's draft annual work programme 2019 details our planned activities from September 2018 to the end of 2019. These include actions taken to implement ENTSO-E’s legal mandates, including network code implementation, system adequacy, system planning, innovation, TSO cooperation, data transparency, and related public consultations. Our work programme also portrays ENTSO-E’s coordinator and facilitator role in the TSO community. MoreClosed 17 September 2018 -
TYNDP 2018 public consultation
ENTSO-E aims with this consultation to get feedback on: TYNDP 2018 main report and the associated 10 Insight Reports MoreClosed 21 September 2018