397 results
-
Regional proposal for splitting long-term cross-zonal capacity under the FCA GL Article 16 for Hansa Capacity Calculation Region
This consultation concerns the All TSOs´ of the Hansa Capacity Calculation Region proposal for a methodology for splitting long-term cross-zonal capacity in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal is the concrete methodology for splitting long-term cross-zonal capacity. MoreClosed 27 May 2019 -
Amended Day-Ahead and Intraday Capacity Calculation Methodology for the Nordic CCR
This consultation concerns the amendment of the Capacity Calculation Methodology for the Day-Ahead and Intraday timeframes in the Nordic CCR, as proposed by the TSOs of the Nordic CCR, being Energinet, Fingrid Oyj, and Svenska kraftnät. The amendment of the Capacity Calculation Methodology follows a Request for Amendment received on December 12 2018 from all NRAs of the Nordic Capacity Calculation Region, being the Danish Utility Regulator DUR, the Finnish Energy Authority Energiavirasto,... MoreClosed 20 May 2019 -
Regional proposal for capacity calculation methodology in accordance with Article 10(1) under the FCA Regulation for Hansa Capacity Calculation Region
This consultation concerns the All TSOs´ of the Hansa Capacity Calculation Region proposal for capacity calculation methodology in accordance with Article 10(1) of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal is the concrete methodology for calculating capacity up to a year ahead, so-called long-term capacity calculation (LT CC). MoreClosed 15 May 2019 -
Regional design of long-term transmission rights for Capacity Calculation Region Hansa
This consultation concerns the addition of the Cobra cable between Denmark (DK1) and the Nederland’s (NL) in appendix 1 in the regional TSO proposal for the design of long-term transmission rights for Capacity Calculation Region Hansa in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal for amendment covers the addition of an interconnector in annex 1 in the design of long-term... MoreClosed 12 May 2019 -
Nordic TSOs’ proposal for FRR dimensioning rules (amended)
This consultation concerns the amended proposal of all Nordic TSOs for the FRR dimensioning rules in accordance with Article 157(1) as required by 119(1)(h) of the commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation). The common proposals of the Nordic TSOs can be found below under the Related Documents. MoreClosed 1 May 2019 -
Long-term Cross-Zonal Capacity Splitting Methodology Proposal for SWE CCR
This consultation concerns the regional TSO’s proposal for the Long-term Cross-Zonal Capacity Splitting Methodology for the SWE CCR, in accordance with Article 16 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. MoreClosed 30 April 2019 -
Long-term Capacity Calculation Methodology Proposal for SWE CCR
This consultation concerns the regional TSO’s proposal for the Long-term Capacity Calculation Methodology for the SWE CCR, in accordance with Article 10 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. This proposal covers the Capacity Calculation Methodology for long-term time frames for the SWE CCR. MoreClosed 15 April 2019 -
Channel Splitting Rules in accordance with FCA Article 16
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), Channel TSOs shall submit a proposal for the methodology for splitting cross-zonal capacity pursuant to FCA Article 16. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk... MoreClosed 15 April 2019 -
Nordic TSOs’ proposal for regional operational security coordination in CCR Nordic (SO GL article 76)
This consultation concerns the “All TSOs’ proposal of Nordic Capacity Calculation Region for regional operational security coordination in accordance with Article 76 and Article 77 of the “Commission Regulation (EU) 2017/1485 of 2 August 2017” establishing a guideline on electricity transmission system operation”. Article 76 of SO GL requires that all TSOs of each capacity calculation region shall jointly develop a common proposal regarding the regional operational security... MoreClosed 15 April 2019 -
Amended Channel Nomination Rules for Physical Transmission Rights
Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs issuing physical transmission rights (PTRs) on a bidding zone border shall submit a proposal for the respective nomination rules. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to... MoreClosed 25 March 2019 -
Digital Technologies Prioritization
This consultation is addressed to the RDIC- WG5 members. The objective is to get your input on which are, to your knowledge, the digital technologies ( List of technologies ) with greater application in the 2030 in the following domains (coincident with the layers of the digital grid): - Physical layer (System development and asset management) - Data Management - System operation - Market layer - Sector coupling MoreClosed 20 March 2019 -
Core CCR – Regional Design of long-term transmission rights based on Article 31 FCA Regulation; here: Second amendment
This consultation is based on Article 4(12) of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the proposed by Core TSOs second amendment of the CCR Core TSOs’ regional design of long-term transmission rights in accordance with Article 31 FCA Regulation. This second amendment proposal covers changes of the type of long-term transmission rights at the bidding zone borders NL-DE/LU, BE-DE/LU, FR-DE/LU, AT-CZ and AT-HU to FTR Options. TSOs of the CCR Core are initiating this... MoreClosed 7 March 2019 -
SEE Region Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with EU Regulation 1222/2015 article 35(3)
This consultation concerns the TSOs from SEE CCR proposal for Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management, article 35(3). MoreClosed 18 February 2019 -
Stakeholder Satisfaction Survey 2018
ENTSO-E represents 43 Transmission System Operators (TSOs) for electricity across 36 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,... MoreClosed 4 February 2019 -
Italy North TSOs informal survey on market participants hedging needs (Article 16(2)(a) FCA)
This consultation concerns the regional TSO proposal for the Methodology for Splitting Long-Term Cross-Zonal Capacity for the Italy North CCR, in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. MoreClosed 27 January 2019 -
Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading for Capacity Calculation Region Greece-Italy
This consultation concerns the regional TSOs’ report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Article 35(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). The methodology for coordination of redispatching and countertrading following Article 35 of CACM Regulation is not yet approved by... MoreClosed 17 January 2019 -
Greece-Italy TSOs proposal of common capacity calculation methodology for long-term timeframe in accordance with Article 10 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation
This consultation concerns the main principles for the Coordinated Capacity Calculation Forward Capacity Allocation methodology (CCC-FCA methodology) for long-term timeframe applied in the Greece-Italy area (GRIT), pursuant to Article 10 of Regulation (EU) 2016/1719 on Capacity Forward Allocation. MoreClosed 17 January 2019 -
Greece-Italy TSOs proposal for splitting long-term cross-zonal capacity in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation
This consultation concerns the splitting of long-term cross-zonal capacity in Greece-Italy Region, pursuant to Article 16 of Regulation (EU) 2016/1719 on Capacity Forward Allocation MoreClosed 17 January 2019 -
SWE TSOs’ Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading
This consultation concerns the regional TSOs’ report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Article 35(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). SWE CCR has not yet started to harmonise mechanisms and agreements regarding redispatching and countertrading as the methodology... MoreClosed 16 January 2019 -
Core TSOs’ Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading
This consultation concerns the regional TSOs’ report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Article 35(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). Core CCR has not yet started to harmonise mechanisms and agreements regarding redispatching and countertrading as the... MoreClosed 13 January 2019 -
Report assessing the progressive coordination and harmonization of mechanisms and agreements for redispatching in CCR Nordics in accordance with EU Regulation 1222/2015 article 35(3)
This consultation concerns the regional TSOs’ report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Article 35(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). CCR Nordic has not yet started to further harmonise mechanisms and agreements regarding redispatching and countertrading as... MoreClosed 12 January 2019 -
IU Long Term Capacity Calculation
This consultation concerns the regional TSO proposal for the Long-Term Capacity Calculation Methodology for the IU CCR, in accordance with Article 10 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. MoreClosed 7 January 2019 -
IU Splitting Rules
IU TSOs are consulting the Splitting Rules Methodology under the CACM Regulation. MoreClosed 7 January 2019 -
Report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading for Capacity Calculation Region Hansa.
This consultation concerns the regional TSOs’ report assessing the progressive coordination and harmonisation of mechanisms and agreements for redispatching and countertrading in accordance with Article 35(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM Regulation). CCR Hansa has not yet started to harmonise mechanisms and agreements regarding redispatching and countertrading as the... MoreClosed 2 January 2019 -
Core TSOs informal survey on market participants hedging needs (Article 16(2)(a) FCA)
The Core TSOs shall according to Article 16 of regulation (EU) 2016/1719 (FCA) develop a methodology for splitting long-term cross-zonal capacity in a coordinated manner between different long-term time frames. This methodology has to comply with the following conditions as defined by Article 16(2) FCA: It shall meet the hedging needs of market participants It shall be coherent with the long-term capacity calculation methodology according to Article 10 FCA It... MoreClosed 31 December 2018 -
Long-Term Capacity Calculation Methodology for the Nordic CCR
This consultation concerns the regional TSO proposal for the Long-Term Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 10 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. MoreClosed 17 December 2018 -
Methodology for splitting long-term cross-zonal capacity
This consultation concerns the regional TSO proposal for the Methodology for Splitting Long-Term Cross-Zonal Capacity for the Nordic CCR, in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation. MoreClosed 17 December 2018 -
Mid-term Adequacy Forecast 2018
Generation not sole factor for EU security of electricity supply: interconnection, flexibility & policy coordination equally important Will demand for power in Europe be covered in the next decade? What is the impact of climate on our power system? Why interdependency between European countries is essential in assessing security of supply? Why coordination at all levels is necessary? These are questions addressed in the new edition of ENTSO-E’s Midterm Adequacy Forecast: a... MoreClosed 16 November 2018 -
All TSOs’ proposal for classification methodology for the activation purposes of balancing energy bids pursuant to Article 29(3)
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding methodology for classifying the activation purposes of balancing energy bids in accordance with Article 29(3) Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing ("EBGL Regulation"). MoreClosed 13 November 2018 -
All TSOs’ proposal on methodologies for pricing balancing energy and cross-zonal capacity used for the exchange of balancing energy or operating the imbalance netting process pursuant to Article 30(1) and Article 30(3)
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding a proposal for a methodology to determine prices for the balancing energy in accordance with Articles 30(1) and 30(3) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing ("EBGL Regulation"). MoreClosed 13 November 2018
397 results.
Page 9 of 14