  • All TSOs’ proposal for the single methodology for pricing cross-zonal intraday capacity

    This consultation concerns the proposal for the single methodology for cross zonal intraday capacity pricing in accordance with Article 55 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (CACM). The single methodology for pricing cross zonal intraday capacity is based on implicit auctions complementing continuous trading mechanism on European level. More
    Opened 11 April 2017
  • Capacity Calculation Methodology Proposal for the Nordic CCR

    This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Nordic CCR, in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for both the Day-ahead and Intraday timeframes for the Nordic CCR. More
    Opened 7 April 2017
  • All TSOs' proposal for amendment to include the upcoming BE-GB interconnector in the decision on capacity calculation regions

    This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance with the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management ("CACM Regulation"). The proposed amendment requests focuses on... More
    Opened 7 April 2017
  • Baltic CCR TSOs' proposal for fallback procedures

    The consultation concerns the Baltic Capacity Calculation Region (CCR) TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Baltic CCR region. More
    Opened 5 April 2017
  • ENTSO-E Connection Codes Implementation Guidance Documents

    Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016. The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called... More
    Opened 5 April 2017
  • Core TSOs’ proposal for Fallback Procedures

    The consultation concerns the Core CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Core region. More
    Opened 27 March 2017
  • Nordic CCR TSOs' proposal for fallback procedures

    The consultation concerns the Nordic CCR TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Regulation). This proposal covers fallback procedures for the Capacity Calculation Region Nordic. Due to time contraints the consultation concerns the explanatory document and not a draft legal proposal. Stakeholder feedback on the... More
    Opened 13 March 2017
  • Regional Design of Long Term Transmission Rights within Core CCR

    This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation (FCA Regulation). This proposal covers the design of Long Term Transmission Rights for the Core Region. More
    Opened 10 March 2017
  • GLDPM-v2 (revised Generation and Load Data Provision Methodology)

    The present public consultation aims at obtaining stakeholders' comments on the Generation and Load Data Provision Methodology pursuant to Article 17 of Regulation 2016/1719 or "GLDPM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). More
    Opened 6 March 2017
  • CGMM-v2 (revised Common Grid Model Methodology)

    The present public consultation aims at obtaining stakeholders' comments on the Common Grid Model Methodology pursuant to Article 18 of Regulation 2016/1719 or "CGMM-v2" (i.e., also incorporating the requirements set out in the FCA Guideline). More
    Opened 6 March 2017
  • SEE CCR: Fallback procedures

    The consultation concerns the regional TSOs' proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management (CACM Reulation). This proposal covers fallback procedures for the SEE Capacity Calculation Region. More
    Opened 1 March 2017
  • ENTSO-E Research and Innovation Implementation Plan 2017-2019

    ENTSO-E R&I Implementation Plan 2017-2019 is the planning instrument for coordinating efforts in research, development, and innovation with the overarching goal of establishing and maintaining an efficient, cost-effective, reliable and secure European power system. Looking at the current state of the art and how technology and business are evolving, the R&I Implementation Plan streamlines the topics earmarked for starting in year 2017 and outlines R&D topics to be tackled in years 2018 and... More
    Opened 24 February 2017
  • Regional Design of Long Term Transmission Rights within SEE CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the SEE Capacity Calculation Region. More
    Opened 20 February 2017
  • Regional Design of Long Term Transmission Rights within Greece-Italy CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Greece-Italy Capacity Calculation Region More
    Opened 8 February 2017
  • IU (Ireland-UK) regional design of Long Term Transmission Rights

    EirGrid Interconnector DAC, Moyle Interconnector Ltd., EirGrid Plc., and SONI Ltd. seek to consult on the Ireland-United Kingdom (IU) regional proposal for the regional design of long-term transmission rights in accordance with Commission Regulation (EU) 2016/1719 establishing a Guideline on Forward Capacity Allocation (the "FCA Regulation"). More
    Opened 8 February 2017
  • Channel Region; FCA Regional Design of Long-Term Transmission Rights – Public Consultation

    The consultation concerns the design of long-term regional design of long-term transmission rights for the Channel CCR with Article 31 of Commission Regulation (EU) 2016/1719 establishing a guideline on forward capacity calculation. This proposal covers the Channel CCRs for the regional design of long-term transmission rights for relevant TSOs within the said region. More
    Opened 8 February 2017
  • Regional Design of Long Term Transmission Rights within Italy North CCR

    The consultation concerns the regional TSOs proposal for design of Long Term Transmission Rights in accordance with Article 31 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation. This proposal covers the Design of Long Term Transmission Rights for the Italy North Capacity Calculation Region More
    Opened 7 February 2017
  • Design of Long Term Transmission Rights on SWE (South West Europe)

    This consultation concerns the regional TSO proposal for the design of Long Term Transmission Rights in accordance with the EU Regulation n°2016/1719, of 26 September 2016, establishing a guideline on forward capacity allocation. This proposal covers the design of Long Term Transmission Rights for the South West Europe Region. More
    Opened 30 January 2017
  • Harmonised Allocation Rules for long-term Transmission Rights - Annex 14

    Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with... More
    Opened 27 January 2017
  • Harmonised Allocation Rules for long-term Transmission Rights

    Following the entry into force of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (the FCA Regulation), all TSOs have to deliver a set of Harmonised Allocation Rules (HAR) for long-term transmission rights. The FCA Regulation aims at promoting the development of liquid and competitive forward markets in a coordinated way across Europe, and at providing market participants with the ability to hedge their risk associated with... More
    Opened 16 January 2017
  • Stakeholder Satisfaction Survey 2016

    ENTSO-E represents 42 Transmission System Operators (TSOs) for electricity across 35 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of supply and to meet the needs of the European Internal Energy Market (IEM). ENTSO-E highly values the input of all actors of the power sector: grid users, equipment manufacturers, service providers,... More
    Opened 11 January 2017
  • “FCR cooperation” potential market design evolutions

    This consultation is performed by the TSOs cooperating in the international procurement of FCR. Filling in the questionnaire will take about 15 to 20 minutes of your time. Many consultation questions are referring to explanations and examples described in the consultation document, therefore it is necessary to read this document, it can be downloaded via the link at the bottom of the page under "related". In case you have questions on the working of the actual consultation tool... More
    Opened 9 January 2017
  • ENTSO-E Connection Codes Implementation Guidance Documents - HVDC and DCC

    Europe currently has three connection network codes: Requirements of generators (RfG ), Demand Connection (DCC) and High Voltage Direct Current (HVDC ). The Member States have the obligation to implement these codes no later than three years after their entry into force. Within this timeframe the Member states have 2 years to define the national specifications for the so-called non-exhaustive requirements. In order to support the implementation at national level and also in... More
    Opened 8 December 2016
  • Fallback procedures for the South West Europe Region Capacity Calculation Region

    This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the South West Europe Region Capacity Calculation Region. More
    Opened 18 November 2016
  • Fallback procedures for the Italy North Region Capacity Calculation Region

    This consultation concerns the regional TSO proposal for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers fallback procedures for the Italy North Region Capacity Calculation Region. More
    Opened 17 November 2016
  • Channel and IU regions; CACM fallback procedures - public consultation

    This consultation concerns two regional TSO proposals for the establishment of fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. These two proposals together cover fallback procedures for the HVDC interconnectors; IFA, BritNed, Moyle and EWIC. More
    Opened 14 October 2016
  • All TSOs’ proposal on DA Scheduled Exchanges Calculation Methodology

    This consultation concerns a common proposal regarding a methodology for calculating scheduled exchanges resulting from single day-ahead coupling in accordance with Article 43 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Opened 4 October 2016
  • All TSOs’ proposal on ID Scheduled Exchanges Calculation Methodology

    This consultation concerns a common proposal regarding a methodology for calculating scheduled exchanges resulting from single intraday coupling in accordance with Article 56 of the Commission Regulation (EU) No 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management (CACM). More
    Opened 4 October 2016
  • Request for input: Going from assumptions to figures - TYNDP 2018 gas and electricity scenarios

    The ENTSO for gas and electricity had gathered in the past 6 month significant feedback from the stakeholders on the assumptions and storylines of the 2030 and 2040 scenarios for the TYNDPs 2018. Now the ENTSOs invite you to express your view on how to interpret the feedback: e.g. what does it mean “high RES penetration”? What is meant “in line with 2050 targets”? Currently ENTSOs aim toward three scenarios to be used in the 2018 version of the TYNDP: ... More
    Opened 20 September 2016
  • Have your say on the Annual Work Programme 2017

    In 2017, ENTSO-E will enter a new phase for several of its important legally mandated tasks. After almost seven years of development work, most of the network codes (NC) will have been adopted. This means that the focus shifts now to the many implementation tasks for all parties concerned, such as transmission system operators (TSOs) for their national implementation of connection codes and, TSOs with support from ENTSO-E for regional and pan-European ‘all TSOs’ tasks in markets and... More
    Opened 17 August 2016