6 results
-
Italy North CCR – Amendment of the Methodology for a common D-2 capacity calculation in accordance with Article 21 of Commision Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management within Italy North CCR
This consultation concerns the Italy North CCR TSOs’ proposal for an amendment to the methodology of a common D-2 capacity calculation in accordance with Article 21 of Commision Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management within Italy North CCR (hereinafter “D-2 CCM”). Italy North TSOs plan to amend the D-2 CCM for the Italy North CCR in order to align the CCM with the current day-ahead operational process and the... MoreCloses 20 December 2024 -
Italy North CCR – Amendment of the Methodology for an intraday common capacity calculation in accordance with Article 21 of Commision Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management within Italy North CCR.
This consultation concerns the Italy North CCR TSOs’ proposal for an amendment to the methodology for an intraday common capacity calculation in accordance with Article 21 of Commision Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management within Italy North CCR (hereinafter “ID CCM”). Italy North TSOs plan to amend the ID CCM for the Italy North CCR in order to align the CCM with the current intraday operational process and... MoreCloses 20 December 2024 -
All TSOs proposal for amending the determination of LFC blocks for the Synchronous Area Continental Europe with regard to the additional Baltic LFC block
Baltic TSOs are in the process of preparing the synchronization of Baltic States Power System with Synchronous Area Continental Europe . Since the current applicable document “Determination of LFC blocks for the Synchronous Area Continental Europe, in amended version of 11 February 2022” does not cover the Baltic TSOs, LFC areas and LFC block(s), the current version needs to be amended to reflect the situation as of date of synchronization, i.e. 9 February 2025. The... MoreCloses 10 January 2025 -
Core TSOs' proposal for the 4th amendment of the Intraday Flow-based Capacity Calculation Methodology
This consultation concerns the Core CCR TSOs’ proposal for the fourth amendment of the Intraday Capacity Calculation Methodology of the Core Capacity Calculation Region in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015 establishing a guideline on capacity allocation and congestion management. MoreCloses 13 January 2025 -
Public consultation on TYNDP 2026 scope and stakeholders engagement plan
Scope of this public consultation This public consultation covers the following studies that are part of the TYNDP 2026: the system needs study, including offshore network development plans per sea basin, and the cost-benefit analysis of projects. It also covers the stakeholder engagement plan for each study. Not in the scope of this consultation are scenarios, which follow a separate consultation process and for which the stakeholder engagement plan was published in July 2024. ... MoreCloses 24 January 2025 -
Public Consultation on identified harmonisation options concerning terms and conditions related to the aFRR and mFRR Platforms
With this survey Transmission System Operators (TSOs) ask stakeholders for input/response to evaluate the identified harmonisation options concerning the terms and conditions according to Article 18 of Regulation (EU) 2017/2195 establishing a guideline on electricity balancing. Following the feedback received in the annual surveys of 2023 and 2024, All TSOs identified possible harmonisation options for each prioritised need on the short list, and developed such shortlist. MoreCloses 31 January 2025
6 results.
Page 1 of 1