ENTSO-E aims with this consultation to get feedback on:

  • CURRENT TYNDP 2016 main report and the associated 12 Insight Reports
  • FUTURE TYNDP 2018 - what shall we consider when building it.
  •  

Overview of all the consultation questions.

Why We Are Consulting

ENTSO-E consults the TYNDP for three main reasons:

  • the future is developed by all of us and there is no one clearly defined path to reach it - developing suitable grid solutions that stands these posibilites is key
  • planning and building the  transmission infrastrure needs all of us to materialise - public acceptance impeds 25% of the pan-European projects to realise on time
  • present the information in a format and at a level that can be used not only by the experts but by all of us.

Note

The TYNDP reports and project sheets presented on this website are drafts for consultation. They will only be considered final after the comments received are assessed, and ENTSO-E and ACER have validated their publication. All information, including on any individual project, must be considered preliminary and is subject to change in the final version.

As per ENTSO-Es rules on consultations, a consultation document can only be modified during the consultation period in order to correct mistakes originated during the layout phase, which takes place after the internal document validation decisions are taken. ENTSO-E cannot accept to update a consultation document due to mistakes originating before the final validation of the document, be it the responsibility of ENTSO-E, its members or any other party.

The document for consultation was updated on 1 September 2016 to correct a “typo” in the flexibility indicator of project 1002 (iLand).

What Happens Next

Your feedback will be used two folds:

- it will support us in improving the current TYNDP 2016 which ENTSO-e will deliver to ACER in October 216 and publish as final end December 2016.

- it will support us in desining and improve the TYNDP 2018 process and deliverables.

 

ENTSO-E would like to thank you very much for your time and effort ptu in helping us to deliver a betterTYNDP with every edition. 

 