APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE.
More
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE.
More
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE.
More
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE.
More
The Single Electricity Market (SEM) of Ireland and Northern Ireland does not have an interconnector with European Union and, due to Brexit, the former IU CCR (SEM-GB CCR) no longer exists.
The SEM is expected to be re-coupled with the EU in 2026, when the Celtic Interconnector is planned to go live. The Celtic Interconnector is a planned subsea HVDC 700 MW link to allow the exchange of electricity between SEM and France. Specifically, the 575 km interconnector is between Knockraha...More
ENTSO-E publishes every year an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme 2024 reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 on the internal market for electricity and related Network Codes and Guidelines, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) No 2022/869 on guidelines for trans-European energy infrastructure,...More
ENTSO-E and ENTSOG public consultation on the TYNDP 2024 Scenarios Input Parameters
ENTSO-E and ENTSOG published their Storylines Report and several key underlying data sets and modeling methodologies as a first deliverable in the formal process for TYNDP 2024 scenario building, as required by Regulations 943/2019 and 715/2009.
All stakeholders are invited to provide feedback until 8 August 2023.
As part of ENTSO-E and ENTSOG’s goal of improved...More
This Annual Report covers the period from January to December 2022. It focuses on the legal mandates given to ENTSO-E and on the Pan-European All TSOs tasks, which are facilitated by ENTSO-E.
While delivering legally mandated tasks, ENTSO-E also aims to support policy objectives, in particular the Green Deal, on a pan-European level. This ambition concerns all aspects of ENTSO-E’s work as the increase of variable renewable generation and the electrification of several sectors,...More
In mid-September 2023, ENTSO-E will begin collecting applications from transmission and storage projects for the TYNDP 2024. To allow project promoters to prepare in advance of the submission period, ENTSO-E is releasing today a draft Guidance document and invites projects promoters and interested stakeholders to comment and raise questions.
The Guidance specifies in particular:
the procedure and the timeline for projects promoters to apply to the TYNDP 2024;
...More
This consultation concerns the Manual of Procedures (MoP) of the Transparency Platform. The new release (MoP v3r4) includes amendments to the existing documents (Detailed Data Descriptions (DDD) and Business Requirements) to better reflect the new requirements of the Transparency platform. These amendments not only will bring more clarity to the current data publications with additional explanations/revisions but also will generate new data publication requirements on the ENTSO-E...More
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules.
The previous public consultation on HAR ending 22 May, was found not to comply with FCA regulation on public consultations, as it did not contain a concrete text proposal of the amended methodology.
Therefore TSOs will conduct a new public...More
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for regional operational security coordination for the capacity calculation region SEE pursuant to Article 76(1) of the Regulation (EU) 2017/1485 establishing a guideline on electricity transmission system operation.
More
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for coordinated redispatching and countertrading for the capacity calculation region SEE in accordance with Article 35(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
More
Article 75 of Commission Regulation (EU) 2017/1485 of 2 August 2017 requires all TSOs to jointly develop a proposal for a methodology for coordinating operational security analysis. With this public consultation, TSOs would like to consult stakeholders on proposals of amendments to this methodology in accordance with Articles 7 and 11 of that Regulation.
Several amendment proposals are motivated by the recommendations of the Investigation Panel on the separation of Continental...More
This survey concerns the presentation of several options for the future RR process implemented in the LIBRA platform. Currently the process is based on 24 gates, but due to the regulation this number of gates must be increased to 48 or 96. It is proposed as a preliminary consultation to gather all public stakeholders’ feedbacks to select the best option. Another public consultation will follow to amend the Implementation Framework thanks to the chosen option . The proposal has been...More
This consultation is based on Article 11 of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (System Operation Guideline, SO GL) and concerns the dimensioning rules for FCR in accordance with Article 153 of the same Regulation.
Article 153(2) of the SO GL provides the possibility for TSOs in CE SA to “define a probabilistic dimensioning approach for FCR taking into account the pattern of load, generation...More
With this annual survey Transmission System Operators (TSOs) ask stakeholders for input/response to evaluate the terms and conditions for Balancing Service Providers (BSP’s) in order to identify possible harmonization needs in the European balancing market. It concerns the terms and conditions according to article 18 of Regulation (EU) 2017/2195 establishing a guideline on electricity balancing.
More
Scope of this public consultation
This public consultation covers the following studies that are part of the TYNDP 2024: the identification of system needs, and the cost-benefit analysis of projects. It also covers the stakeholder engagement plan for each study.
Not in the scope of this consultation are scenarios, which follow a separate consultation process organised jointly with ENTSOG, with two public consultations planned in 2023. Also excluded from the scope of...More
The “Methodology for Identifying Regional Electricity Crisis Scenarios” (the RP Methodology) was first approved by ACER in 2020 pursuant to Article 5 of Regulation (EU) 2019/941 of the European Parliament and of the Council on risk-preparedness in the electricity sector (RPR, link ). The methodology lays down a framework on how TSOs identify electricity crisis scenario candidates and how these should be assessed into regional electricity crisis scenarios.
Article 5 of the RPR...More
ENTSO-E publishes every year an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme 2024 reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 on the internal market for electricity and related Network Codes and Guidelines, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) No 2022/869 on guidelines for trans-European energy...More
This consultation concerns an external parallel run evaluation report for assessment by the NRAs of the Nordic CCR, as required by the Nordic DA/ID CCM that was approved by the NRAs of the Nordic CCR on October 14th, 2020.
Please note: restrictions in the web survey tool
If you would like to illustrate your point using figures/graphs or if your response exceeds the word limit, please feel free to provide this information via e-mail to ccm@nordic-rcc.net .
More
Core CCR runs this survey about the quality of the provided data and the ease-of-use of data retrieval on the JAO platform. The aim is to gather the stakeholders’ feedback, which will assist Core TSOs in considering further improvements to be implemented. An overview of the survey results will be included in the annual report.
More
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules.
The current amendment proposal for HAR submitted to ACER 1 March contains general updates and several updates related to the introduction of LT FBA.
The 1 March submission will be complemented and merged with a new submission 1 June containing a...More
This consultation concerns the regional TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, in accordance with Article 37 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing. This proposal covers the Capacity Calculation Methodology for the Balancing Timeframe for the Baltic Capacity Calculation Region.
More
In accordance with the ACER decision 29/2020 of 24 November 2020 on the methodology and assumptions that are to be used in the Bidding Zone Review process and for the alternative bidding zone configurations to be considered (BZR Methodology), Transmission System Operators ("TSOs") of all Bidding Zone Review Regions shall jointly perform a study in order to estimate transition costs occurring from a bidding zone reconfiguration. TSOs have launched a first questionnaire on transition...More
With the integration of Europe’s electricity markets, large-scale renewable capacity integration and shifting demand patterns on the path to European climate neutrality goals, resource adequacy will be in the spotlight for coming decades. ENTSO-E and its TSO members are continuously striving to enhance each ERAA edition with the feedback received by stakeholders, to ensure a swift and efficient implementation. The stepwise approach endorsed by ACER on 2 October 2020 is the basis for...More
This consultation concerns the amended methodology of all Nordic TSOs for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation).
The main trigger for this amendment is the change from a Market Time Units (MTU) of 60 minutes to a MTU of 15 minutes in both the intraday market and day-ahead...More
This consultation concerns the amended methodology of all Nordic TSOs for sharing and exchange limits of FRR/RR between synchronous areas in accordance with Article 176(1), 177(1), 178(1) and 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO Regulation).
The main trigger for this amendment is the implementation of markets that allow for exchanging FRR energy and capacity between...More
The TYNDP 2022 package was submitted to public consultation from end-July to mid-September 2022. Cost-benefit analysis (CBA) results for several scenarios have become available between August and December 2022. This short public consultation aims at giving stakeholders the possibility to comment on CBA results.
CBA results are available in online project sheets, accessible from our online platform . To view the results of a specific project, open that project and go to 'Project...More
This consultation concerns the amendment of the regional TSO proposal for the common coordinated capacity calculation methodology in accordance with Article 20(2) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal covers the amendment of the Art. 15(1) of the capacity calculation methodology for Capacity Calculation Region Hansa
More