This consultation concerns the Core CCR TSOs’ proposal for required by them amendments to the Regional Specific Annex for the CCR Core to the Harmonised Allocation Rules for long-term transmission rights in accordance with Article 52 of Commission Regulation (EU) 2016/1719 of 26 September 2016...More
This consultation concerns the proposal regarding the determination of LFC blocks in the Nordic synchronous area developed in accordance with article 141(2) of commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL). SO...More
This consultation concerns the all TSOs proposal for the methodology for assessing the relevance of assets for outage coordination developed in accordance with article 84(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system...More
This consultation concerns the all TSOs proposal for the methodology for coordinating operational security analysis developed in accordance with article 75(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concern updated specific requirements applicable to the Baltic CCR at the Estonia-Latvia Bidding Zone border level pursuant to Article 52(3) of the FCA Regulation. More
This consultation concerns the proposal of all TSOs performing the reserve replacement process for the implementation framework for European Platform for the exchange of balancing energy from Replacement Reserves in accordance with Article 19 of Commission Regulation (EU) 2017/2195 of 23 November...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion...More
This consultation concerns the regional TSO proposal for the Capacity Calculation Methodology for the Italy North Capacity Calculation Region (CCR), in accordance with Article 20 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion...More
This consultation concerns the Italy North TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. More
This consultation concerns all TSOs’ proposal for the implementation framework for a European platform for the imbalance netting process in accordance with Article 22 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing More
This consultation concerns the Greece-Italy TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. More
This consultation concerns a common proposal developed by the TSOs of Austria, Belgium, the Czech Republic, Denmark, France, Germany, Hungary, Italy, Luxembourg, the Netherlands, Poland, Slovakia and Slovenia regarding the Review of the existing bidding zone configurations in accordance with...More
The consultation concerns the regional TSOs proposal for SEE CCR Coordinated Redispatching and Countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Calculation and Congestion Management. More
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016.
The Member States have the obligation...More
As part of the TYNDP 2018 package ENTSO-E prepared six Regional Investment Plans covering all Europe. These reports are looking at power system development issues from a regional perspective accounting for their particularities and closely coordinated at European level.
The European Power...More
This consultation concerns the common proposal developed by RTE, REE and REN as the Transmission System Operators of the SWE Capacity Calculation Region regarding the proposal for the methodology for coordinated redispatching and countertrading in accordance with the Commission Regulation (EU)...More
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Baltic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and...More
This consultation concerns the Channel TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management More
This consultation concerns the proposal on the assumptions and methodology for a cost-benefit analysis to be conducted, in order to assess the time period required for FCR providing units or groups with limited energy reservoirs to remain available during alert state, developed in accordance with...More
This stakeholder consultation concerns the Frequency Containment Reserve (FCR) cooperation draft proposal for the market design and is performed in accordance with article 10 of the guideline on electricity balancing (GLEB). Article 33 of GLEB provides that TSOs exchanging balancing capacity...More
This consultation concerns the IU TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. More
This consultation concerns the regional TSO proposal for the c oordinated redispatching and countertrading methodology ('CRC Methodology') for the Nordic CCR, in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation...More
ENTSO-E represents 43 Transmission System Operators (TSOs) for electricity across 36 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of...More
This consultation concerns the regional TSO proposal for the coordinated redispatching and countertrading methodology in accordance with Article 35 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. This proposal...More
This consultation concerns the regional TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management More
This consultation concerns the proposal regarding the determination of LFC blocks in the synchronous area of Ireland and Northern Ireland developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission...More
This consultation concerns the proposal regarding the determination of LFC blocks in Continental Europe synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO...More
This consultation concerns the proposal regarding the determination of LFC blocks in Great Britain synchronous area developed in accordance with article 141(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (SO GL)....More
Europe currently has three connection network codes: Requirements for generators (RfG), Demand Connection (DCC) and High Voltage Direct Current (HVDC). RfG has entered into force on 17 May 2016, the DCC on 18 August 2016 and the HVDC on 8 September 2016.
The Member States have the obligation...More
This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the amendment of Annex 1 of the decision of the Agency for the Cooperation of Energy Regulators ("ACER") on the determination of Capacity Calculation Regions ("CCRs") in accordance...More