396 results
-
ERAA Market survey - Test file upload
test MoreOpened 2 May 2025 -
CCR Nordic TSOs’ proposal for the 6 months’ testing period of the Intraday Flow-Based Capacity Calculation Methodology
This survey concerns the Nordic TSOs’ proposal for the 6 months’ testing period of the Intraday Flow-Based Capacity Calculation Methodology, in accordance with Article 20(8) of COMMISSION REGULATION (EU) 2015/1222of 24 July 2015, establishing a guideline on capacity allocation and congestion management. MoreOpened 6 May 2025 -
Pre-consultation on the ENTSO-E Annual Work Programme list of tasks 2026
ENTSO-E publishes an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 as amended by REGULATION (EU) 2024/1747 on the internal market for electricity, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) 2022/869 on guidelines for trans-European energy infrastructure, REGULATION (EU)... MoreOpened 6 May 2025 -
Investor Survey: How can ERAA better reflect real investment behaviour?
ENTSO-E is currently preparing to propose amendments to the ERAA methodology, drawing on the recommendations from the Commission, ACER, as well its experience in conducting the previous four editions of the ERAA. One key aspect under review is the Economic Viability Assessment (EVA), the step within ERAA that aims to assess the likelihood and conditions under which generation, storage, or demand-side resources may exit or enter the market over a 10-year horizon. The latest EVA results from... MoreOpened 7 May 2025 -
All TSOs’ proposal for amendment of the Determination of capacity calculation regions methodology in accordance with Article 15(1) of the CACM
With its letter from 30 January 2025 ACER requests, in accordance with Article 9(6)(b) and 9(13) of the CACM Regulation, that all TSOs develop a proposal for an amendment of the determination of CCRs under Article 15 of the EU CACM Regulation which incorporates the capacity calculation regions of the Energy Community (EnC) Contracting parties and the neighbouring EU countries. ACER considers that the inclusion of the EnC CCRs in the determination of CCRs in accordance with Article... MoreOpened 14 May 2025 -
HANSA CCR – Amended Day-Ahead Fallback Procedures (CACM Art. 44)
This consultation concerns the 2nd amendment of the Hansa CCR Fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management. MoreOpened today
396 results.
Page 14 of 14