381 results
-
European Resource Adequacy Assessment 2023
Will demand for power in Europe be covered in the next decade by adequate supply? What could be the impact of climate on the European power system? Why is interdependency between European countries essential in assessing security of supply? Why is coordination at all levels necessary? These are some of the questions addressed in the third edition of ENTSO-E’s European Resource Adequacy Assessment (ERAA): a state-of-the-art pan-European monitoring assessment of power system resource... MoreClosed 31 January 2024 -
All TSOs’ proposal for amendment of the methodology for calculating scheduled exchanges in accordance with Article 41 of the CACM
The methodology for Day-Ahead Scheduled Exchanges Calculation (DA SEC) is developed pursuant to art. 43 of Commision Regulation (EU) 2015/1222 of 24 July 2015 . The methodology for DA SEC describes the optimization problem integrated in price coupling algorithm (Euphemia), and DA SEC determines commercial flows on bidding zone borders constrained by the net positions determined in the previous market coupling step in Euphemia. As an integral part of the Euphemia algorithm, DA... MoreClosed 8 January 2024 -
All TSOs Proposal for Amendments – aFRR IF (Art. 21 of EB Regulation) and Pricing Methodology (Art. 30(1) of EB Regulation)
This consultation concerns the proposed by All TSOs amendments regarding two documents: 1) Implementation framework for the European platform for the exchange of balancing energy from frequency restoration reserves with automatic activation in accordance with Article 21 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing; and 2) Methodology for pricing balancing energy and cross-zonal capacity used for the... MoreClosed 12 December 2023 -
Update proposal for the Methodology for Identifying Regional Electricity Crisis Scenarios
The “Methodology for Identifying Regional Electricity Crisis Scenarios” (the RP Methodology) was first approved by ACER in 2020 pursuant to Article 5 of Regulation (EU) 2019/941 of the European Parliament and of the Council on risk-preparedness in the electricity sector (RPR, link ). The methodology lays down a framework on how TSOs identify electricity crisis scenario candidates and how these should be assessed into regional electricity crisis scenarios. Article 5 of the RPR... MoreClosed 5 December 2023 -
Baltic CCR TSOs’ proposal for Day Ahead and Intraday Capacity Calculation Methodology according to Commission Regulation (EU) 2015/1222 establishing a guideline on capacity allocation and congestion management.
This consultation concerns the proposed Baltic CCR TSOs’ proposal on Day Ahead and Intraday Capacity Calculation Methodology according to Commission Regulation (EU) 2015/1222 establishing a guideline on capacity allocation and congestion management. This proposal covers the Capacity Calculation Methodology for the for short term timeframes covering day ahead and intraday. MoreClosed 30 November 2023 -
All TSOs’ proposal for amendment of the Determination of capacity calculation regions methodology in accordance with Article 15(1) of the CACM
With its letter from 17 July 2023 ACER requests, pursuant to Article 9(13), read in conjunction with Article 9(6) of the CACM Regulation, that all TSOs develop an amendment of the Determination of CCRs to merge Core and Italy North capacity calculation regions for day-ahead capacity calculation. ACER considers it necessary, and in line with the objectives of the CACM Regulation, that CCR Core and CCR ITN are merged and apply a common capacity calculation using the flowbased approach.... MoreClosed 11 November 2023 -
DSO Entity & ENTSO-E Public consultation on Network Code for Demand Response
Based on Article 59(9) of the Regulation (EU) 2019/943 , on 9 March 2023 the EU Commission invited DSO Entity and ENTSO-E to submit a proposal to ACER for the network code Demand Response in accordance with the relevant framework guidelines , within a reasonable period of time that should not exceed 12 months. To foster transparency and receive your views, DSO Entity and ENTSO-E are delighted to invite you to participate in the public consultation on the content of the... MoreClosed 10 November 2023 -
Core TSOs' proposal for the 3rd amendment of the Day-Ahead Flow-based Capacity Calculation Methodology on multiple technical aspects
This consultation concerns the Core CCR TSOs’ proposal for the third amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region (Core DA CCM) in accordance with article 20ff. of the Commission Regulation (EU) 2015/1222 of 24th July 2015 establishing a guideline on Capacity Allocation and Congestion Management (CACM). Based on Article 5 (5), Article 7 (4), Article 8 (7), Article 9 (6) and Article 20 (4) of the currently effective Core DA CCM, the... MoreClosed 25 October 2023 -
Italy North CCR – Amendment of the Splitting long-term cross-zonal capacity for Italy North CCR in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation
This consultation concerns the Italy North CCR the Splitting long-term cross-zonal capacity for Italy North CCR in accordance with Article 16 of the Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a Guideline on Forward Capacity Allocation (hereinafter “Splitting Methodology”). Italy North TSOs plan to amend the Splitting Methodology for the Italy North CCR in order to optimize the distribution of the capacity between the yearly and monthly auctions. ... MoreClosed 20 October 2023 -
TYNDP 2024 CBA Implementation Guidelines
The TYNDP-specific Cost Benefits Analysis (CBA) Implementation Guidelines are an accompanying document of the 4th ENTSO-E CBA Guideline, which aims to provide more guidance and information on data, methodology, tools, and illustrative examples to be used for the assessment of network development projects. For each new edition of the TYNDP, a new edition of the Implementation Guidelines has to be developed to specify how the CBA guideline is to be implemented. Following the... MoreClosed 16 October 2023 -
ALPACA – Common and Harmonized Rules and Processes for the Exchange and Procurement of Balancing Capacity for Automatic Frequency Restoration Reserves for AT-CZ in accordance with Article 33(1) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Common and Harmonized Rules and Processes for the Exchange and Procurement of Balancing Capacity for Automatic Frequency Restoration Reserves for CZ-DE in accordance with Article 33(1) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Methodology for Calculating the Probability of Available Cross-zonal Capacity after Intraday Cross-zonal Gate Closure Time in accordance with Article 33(6) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
ALPACA – Algorithm to be Operated by the Capacity Procurement Optimization Function for the Procurement of Balancing Capacity Bids in accordance with Article 58(3) of Commission Regulation (EU) 2017/2195 of 23 November 2017 Establishing a Guideline on Electricity Balancing as Amended by Commission Implementing Regulation (EU) 2021/280 of 22 February 2021
APG, CEPS and German TSOs intent to implement a cooperation on common procurement of aFRR balancing capacity on the borders between AT-CZ and CZ-DE. MoreClosed 25 September 2023 -
All TSOs’ proposal for amendment of the Determination of capacity calculation regions methodology in accordance with Article 15(1) of the CACM
The Single Electricity Market (SEM) of Ireland and Northern Ireland does not have an interconnector with European Union and, due to Brexit, the former IU CCR (SEM-GB CCR) no longer exists. The SEM is expected to be re-coupled with the EU in 2026, when the Celtic Interconnector is planned to go live. The Celtic Interconnector is a planned subsea HVDC 700 MW link to allow the exchange of electricity between SEM and France. Specifically, the 575 km interconnector is between Knockraha... MoreClosed 21 August 2023 -
Amendments to the Manual of Procedures (MoP v3r4) of the Transparency Platform
This consultation concerns the Manual of Procedures (MoP) of the Transparency Platform. The new release (MoP v3r4) includes amendments to the existing documents (Detailed Data Descriptions (DDD) and Business Requirements) to better reflect the new requirements of the Transparency platform. These amendments not only will bring more clarity to the current data publications with additional explanations/revisions but also will generate new data publication requirements on the ENTSO-E... MoreClosed 17 August 2023 -
Consultation on the ENTSO-E Annual Work Programme 2024
ENTSO-E publishes every year an Annual Work Programme as required under REGULATION (EU) 2019/943 on the internal market for electricity. The priorities outlined in the Work Programme 2024 reflect the legal mandates given to ENTSO-E by REGULATION (EU) 2019/943 on the internal market for electricity and related Network Codes and Guidelines, REGULATION (EU) 2019/941 on risk-preparedness in the electricity sector, REGULATION (EU) No 2022/869 on guidelines for trans-European energy infrastructure,... MoreClosed 16 August 2023 -
TYNDP 2024 Scenarios Input Parameters
ENTSO-E and ENTSOG public consultation on the TYNDP 2024 Scenarios Input Parameters ENTSO-E and ENTSOG published their Storylines Report and several key underlying data sets and modeling methodologies as a first deliverable in the formal process for TYNDP 2024 scenario building, as required by Regulations 943/2019 and 715/2009. All stakeholders are invited to provide feedback until 8 August 2023. As part of ENTSO-E and ENTSOG’s goal of improved... MoreClosed 8 August 2023 -
TYNDP 2024 Guidance for promoters
In mid-September 2023, ENTSO-E will begin collecting applications from transmission and storage projects for the TYNDP 2024. To allow project promoters to prepare in advance of the submission period, ENTSO-E is releasing today a draft Guidance document and invites projects promoters and interested stakeholders to comment and raise questions. The Guidance specifies in particular: the procedure and the timeline for projects promoters to apply to the TYNDP 2024; ... MoreClosed 7 August 2023 -
Survey on harmonisation of terms and conditions related to the aFRR, mFRR and IN Platforms
With this annual survey Transmission System Operators (TSOs) ask stakeholders for input/response to evaluate the terms and conditions for Balancing Service Providers (BSP’s) in order to identify possible harmonization needs in the European balancing market. It concerns the terms and conditions according to article 18 of Regulation (EU) 2017/2195 establishing a guideline on electricity balancing. MoreClosed 24 July 2023 -
Have your say on the ENTSO-E's Annual Report 2022
This Annual Report covers the period from January to December 2022. It focuses on the legal mandates given to ENTSO-E and on the Pan-European All TSOs tasks, which are facilitated by ENTSO-E. While delivering legally mandated tasks, ENTSO-E also aims to support policy objectives, in particular the Green Deal, on a pan-European level. This ambition concerns all aspects of ENTSO-E’s work as the increase of variable renewable generation and the electrification of several sectors,... MoreClosed 21 July 2023 -
All TSOs’ proposal for amendments of the methodology for Harmonised Allocation Rules for long-term transmission rights
This consultation is based on Article 6 of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the review of Harmonised Allocation Rules for long-term transmission rights (HAR) in accordance with Article 68(5) of these rules. The previous public consultation on HAR ending 22 May, was found not to comply with FCA regulation on public consultations, as it did not contain a concrete text proposal of the amended methodology. Therefore TSOs will conduct a new public... MoreClosed 8 July 2023 -
Public survey on the change of the number of clearings for the exchange of balancing energy from Replacement Reserves in accordance with Article 19 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing
This survey concerns the presentation of several options for the future RR process implemented in the LIBRA platform. Currently the process is based on 24 gates, but due to the regulation this number of gates must be increased to 48 or 96. It is proposed as a preliminary consultation to gather all public stakeholders’ feedbacks to select the best option. Another public consultation will follow to amend the Implementation Framework thanks to the chosen option . The proposal has been... MoreClosed 7 July 2023 -
First amendment of the Methodology for coordinated redispatching and countertrading for the SEE CCR
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for coordinated redispatching and countertrading for the capacity calculation region SEE in accordance with Article 35(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management MoreClosed 1 July 2023 -
First amendment of the Methodology for regional operational security coordination for the SEE CCR
This consultation concerns the SEE TSO’s proposal for amendment to the Methodology for regional operational security coordination for the capacity calculation region SEE pursuant to Article 76(1) of the Regulation (EU) 2017/1485 establishing a guideline on electricity transmission system operation. MoreClosed 1 July 2023 -
Update proposal of Methodology for Identifying Regional Electricity Crisis Scenarios
The “Methodology for Identifying Regional Electricity Crisis Scenarios” (the RP Methodology) was first approved by ACER in 2020 pursuant to Article 5 of Regulation (EU) 2019/941 of the European Parliament and of the Council on risk-preparedness in the electricity sector (RPR, link ). The methodology lays down a framework on how TSOs identify electricity crisis scenario candidates and how these should be assessed into regional electricity crisis scenarios. Article 5 of the RPR... MoreClosed 30 June 2023 -
Amendments proposals to the methodology for coordinating operational security analysis
Article 75 of Commission Regulation (EU) 2017/1485 of 2 August 2017 requires all TSOs to jointly develop a proposal for a methodology for coordinating operational security analysis. With this public consultation, TSOs would like to consult stakeholders on proposals of amendments to this methodology in accordance with Articles 7 and 11 of that Regulation. Several amendment proposals are motivated by the recommendations of the Investigation Panel on the separation of Continental... MoreClosed 30 June 2023 -
Methodology for performing the probabilistic dimensioning of FCR in CE synchronous area
This consultation is based on Article 11 of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (System Operation Guideline, SO GL) and concerns the dimensioning rules for FCR in accordance with Article 153 of the same Regulation. Article 153(2) of the SO GL provides the possibility for TSOs in CE SA to “define a probabilistic dimensioning approach for FCR taking into account the pattern of load, generation... MoreClosed 15 June 2023 -
Core CCR 2023 survey quality of the data published
Core CCR runs this survey about the quality of the provided data and the ease-of-use of data retrieval on the JAO platform. The aim is to gather the stakeholders’ feedback, which will assist Core TSOs in considering further improvements to be implemented. An overview of the survey results will be included in the annual report. MoreClosed 9 June 2023 -
Public consultation on TYNDP 2024 scope of studies and stakeholder engagement plan
Scope of this public consultation This public consultation covers the following studies that are part of the TYNDP 2024: the identification of system needs, and the cost-benefit analysis of projects. It also covers the stakeholder engagement plan for each study. Not in the scope of this consultation are scenarios, which follow a separate consultation process organised jointly with ENTSOG, with two public consultations planned in 2023. Also excluded from the scope of... MoreClosed 8 June 2023
381 results.
Page 2 of 13