Find Consultations

  • Stakeholder Satisfaction Survey 2019

    ENTSO-E represents 42 Transmission System Operators (TSOs) for electricity across 35 European countries. Our overall objective is to promote the reliable operation, optimal management and sound technical evolution of the European electricity transmission system in order to ensure security of... More
    Opened 15 January 2020
  • Nordic CCR – Capacity calculation methodology in accordance with article 20 of CACM; second amendment

    This consultation concerns the second amendment of the Capacity Calculation Methodology for the Day-Ahead and Intraday timeframes in the Nordic CCR, as proposed by the TSOs of the Nordic CCR, being Energinet, Fingrid Oyj, and Svenska kraftnät. The amendment of the Capacity Calculation... More
    Opened 15 January 2020
  • Core CCR – Regional Design of long-term transmission rights based on Article 31 FCA Regulation; Third amendment

    This consultation is based on Article 4(12) of Commission Regulation (EU) 2016/1719 (FCA Regulation) and concerns the proposed by Core TSOs’ third amendment of the CCR Core TSOs’ regional design of long-term transmission rights in accordance with Article 31 FCA Regulation. This Third... More
    Opened 18 December 2019
  • Proposal for a European Resource Adequacy Assessment Methodology

    The recent legislative package on Clean Energy for all Europeans , specifically Regulation 2019/943 of 5 June 2019 on the internal market for electricity, places resource adequacy in a central position in the European energy policy context. As per Article 23 of the Electricity Regulation,... More
    Opened 5 December 2019
  • Proposal for VoLL, CONE and Reliability Standard Methodology

    The recent legislative package on Clean Energy for all Europeans , specifically Regulation 2019/943 of 5 June 2019 on the internal market for electricity, places resource adequacy in a central position in the European energy policy context. As per Article 23 of the Electricity... More
    Opened 5 December 2019
  • Stakeholder consultation on the "Deterministic Frequency Deviations" report

    ENTSO-E has recently finalized a draft report on “Deterministic Frequency Deviation” (DFD) which is now submitted for feedback for a period of two months and until 3 February 2020 (23:59). A set of selected questions is provided to guide your effective feedback, giving you the opportunity... More
    Opened 3 December 2019
6 results. Page 1 of 1